Grove Farm development approved at appeal

Breaking News: Hart needs to build 1,500 fewer houses for the Local Plan

Grove Farm (Netherhouse Copse) development allowed on appeal

The planning inspector has granted outline planning permission to the Grove Farm (Netherhouse Copse) development, between Fleet and Crookham Village. This comes as a blow to those of us who oppose green field development, so our commiserations go to those most affected by this decision.

Grove Farm - Netherhouse Copse appeal decision

The full decision can be found here.

Impact of Grove Farm (Netherhouse Copse) decision

It is early days to come to firm conclusions, but here are a few thoughts:

  • Costs. The appeal decision doesn’t talk about the costs of the appeal, but at the very least the council will have to meet its own costs. These are likely to be of the order of £100,000. This is a self-inflicted wound as it was the council itself that failed to make a decision on the planning application. This left the developer with little choice but to appeal on the grounds of non-determination.

 

  • Local Plan. This decision adds 423 houses to the housing supply that weren’t in the draft Local Plan. Theoretically, this could free up other sites that are in the Local Plan. Of course, if the council adopts the new Government methodology for calculating housing need, we certainly won’t need a new settlement now, and it is questionable whether even Hartland Village will be required. [Update 2] The finding that the polices are out of date and the level of housing supply is irrelevant makes it imperative that the council gets the Local Plan and associated policies in place ASAP [/Update 2].

 

  • Community Campaign Hart (CCH). This party will be particularly angry and disappointed at this decision. They also suffered setbacks with the recent decisions at Watery Lane, Crookham Park and Edenbrooke. However, to our knowledge, CCH have never challenged the ridiculous housing target. Now they are putting in place obstructions to brownfield development. Perhaps now is the time to rethink their strategy. They should focus on a sensible housing target and brownfield development.

We will provide further updates as we find out more information.

[Update 1]

Detailed findings from the Inspector

The decision rested on a number criteria. First, the inspector found limited impact on the Local Gap between Fleet and Crookham Village. Here is the Inspector’s summary:

Grove Farm (Netherhouse Copse) Local Gap decision

Grove Farm (Netherhouse Copse) Local Gap decision

Second, the inspector found no grounds to reject the application based on highway safety:

Grove Farm (Netherhouse Copse) Highway Safety decision

Grove Farm (Netherhouse Copse) Highway Safety decision

Third, the inspector found it to be very significant that most of the policies that the council relied upon for its defence were out of date:

Grove Farm (Netherhouse Copse) Out of date policies

Grove Farm (Netherhouse Copse) Out of date policies

Grove Farm (Netherhouse Copse) Out of date policies 2

Grove Farm (Netherhouse Copse) Out of date policies

Fourth, the inspector didn’t determine one way or the other whether the council has a five year land supply. Essentially, the five year land supply is irrelevant.

Grove Farm (Netherhouse Copse) Housing Supply Irrelevant

Grove Farm (Netherhouse Copse) Housing Supply Irrelevant

In summary, the inspector found significant economic benefits, and that the potential harms would not outweigh those benefits.

Grove Farm (Netherhouse Copse) Summary of decision

Grove Farm (Netherhouse Copse) Summary of decision

[/Update 1]

 

Hart SANG plan to obstruct brownfield development

James Radley of CCH pulling the string of Graham Cockarill in Hart SANG plan to obstruct brownfield development

CCH calling the shots on Hart SANG plan to obstruct brownfield development

Hart Council has published a new report recommending that its own SANG land should not be used to enable brownfield development. This effectively renders the council’s SANG useless and calls into question the council’s ability to fund the repayments on the loan it has taken out to buy the SANG.

The document is sponsored by Community Campaign Hart (CCH) Deputy Leader, James Radley and not the portfolio holder for Planning, Lib Dem Graham Cockarill. This indicates that CCH is pulling the strings on important planning matters. The Hart SANG plan will be discussed at Cabinet tomorrow.

Hart SANG plan

Hart has bought its own SANG land at Bramshot Farm which lies between Ancells Farm and the link road between Hartland Village and the M3. The site has capacity to support 1,745 new houses. The new report proposes that no SANG land is allocated to the sites set out below unless signed off by both the Services Portfolio Holder (James Radley) and the chair of the Planning Committee (Graham Cockarill).

Brownfield sites affected

The following brownfield sites will effectively be blocked from development by the Hart SANG plan:

  • Bartley Wood, Hook, RG27, 9UP
  • Bartley Point, Hook, RG27 9EX
  • Cody Park, Farnborough, GU14 0LX
  • Meadows Business Park, Blackwater, GU17 9AB
  • Osborne Way, Hook, RG27 9HY
  • Waterfront Business Park, Fleet, GU51 3OT
  • Ancells Business Park, Fleet, GU51 2UJ (right next door to Bramshot Farm)
  • Blackbushe Business Park, GU46 6GA
  • Eversley Haulage Yard, RG27 0PZ
  • Eversley Storage, RG27 0PY
  • Finn’s Business Park, Crondall, GU10 5HP
  • Fleet Business Park, Church Crookham, GU52 8BF
  • Grove Farm Barn, Crookham Village, GU51 5RX
  • Lodge Farm, North Warnborough, RG29 1HA
  • Murrell Green Business Park, RG27 9GR
  • Potters Industrial Park, Church Crookham, GU52 6EU
  • Rawlings Depot, Hook, RG27 9HU
  • Redfields Business Park, Church Crookham, GU52 0RD
  • Optrex Business Park, Rotherwick, RG27 9AY

Essentially, development on every significant potential brownfield site other than Hartland Park and Sun Park (which already have SANG earmarked), will be hindered by this new proposal.

This new proposal runs contrary to the Vision outlined in the draft Local Plan which says:

The priority will have been given to the effective use of previously developed land (‘brownfield land’) so that ‘greenfield’ development will have been limited,

It also runs contrary to paras 105 and 107:

Our preference is still to deliver as much of our New Homes Left to Plan as possible on previously developed land.

many new homes will be built on brownfield sites (where possible and if they are viable)

Their new approach also goes against policy MG2 that says:

Policy MG2: Previously Developed Land

The Council will encourage the effective use of land by reusing land that has been previously developed (brownfield land), provided that it is not of high environmental value.

Of course, this plan also goes against stated Government policy to encourage brownfield development. See here and here.

Financial impact of Hart SANG plan

However, all the large, controversial green field developments are being proposed with their own SANG. This includes Murrell Green, Winchfield, Pale Lane (Elvetham Chase), Rye Common and Grove Farm (Netherhouse Copse). Most of these sites are probably outside the 5km catchment area of this SANG anyway or closer to Crookham Park SANG. Of course, the new Government consultation has reduced Hart’s housing target by ~4,000 houses compared to the draft Local Plan. If this new target (plus a few extra to help out Surrey Heath) was adopted, our remaining housing target could be more than met by Sun Park and Hartland Park alone.

So, if the main brownfield sites are excluded from using the council SANG, the other brownfield sites have their own SANG and the major greenfield sites are not needed, or have their own SANG,  we have to ask what it will be used for.

Apparently, the council is about to sign an agreement with Rushmoor to use the SANG to support the delivery of approximately 1,500 new homes in Rushmoor. However, the latest Government housing target consultation has reduced Rushmoor’s allocation by ~3,000 dwellings and Surrey Heath’s by 630 houses. This calls into question whether Rushmoor will need this SANG at all.

The council is strapped for cash, and has borrowed £5.3m to fund the purchase of this SANG. It must payback this loan in instalments up to 2023/24:

Financial implications of Hart SANG plan

These new developments call into question the immediate demand for this SANG, and of course, Hart’s ability to repay the loan.

Conclusion

It is a scandal that Hart is using its powers to obstruct brownfield development. The major greenfield developments come with their own SANG, and probably aren’t required anyway. Rushmoor and Surrey Heath’s housing targets will probably be reduced. This calls into question the financial sustainability of the council’s purchase of this SANG land.

image

Hart major planning site update

Hart Major Planning Site: Hartland Park (Pyestock) Master Plan

Hart major planning site: Hartland Park (Pyestock) Master Plan

This post will provide a Hart major planning sites update. We will cover:

  • Hartland Park (Pyestock)
  • Pale Lane (Elvetham Chase)
  • Grove Farm (Netherhouse Copse), Fleet
  • Cross Farm

Hart Major Planning Site: Hartland Park (Pyestock)

The first Hart major planning site is Hartland Park. This is the site of former Pyestock National Gas Turbine Establishment. Hart Council’s planning committee has agreed to the principle of building up to 1,500 new homes on this brownfield site.

Hart Major Planning Site: Hartland Village

Hart Major Planning Site: Hartland Village

The decision is subject to a number of conditions:

  • Hampshire County Council withdrawing its highway objection.
  • Confirmation of viability issues associated with affordable housing.
  • Securing appropriate SANG land.
  • Further consideration by the Major Sites Sub-Committee.

Our views on Hartland Park

We agree with this decision in principle, but echo the council’s concern about a number of items:

  • The developer is proposing only 20% Affordable Housing. We would like to see more affordable housing and especially some social housing for those who can’t rent and can’t buy.
  • We are concerned about the road network and therefore think Kennels Lane should be upgraded to provide a relief road around the site
  • There should be a proper cycle/walking route installed to provide easy access to Fleet station.

We will continue to monitor this development.

Full documents on Hart’s planning site can be found here.

Hart Major Planning Site: Pale Lane (Elvetham Chase)

Pale Lane (Elvetham Chase) planning application dates

Pale Lane (Elvetham Chase) planning application dates

Second up is Pale Lane aka Elvetham Chase. This is an application for 700 new houses near Pale Lane, between Elvetham Heath, the railway and the M3. The controversial planning application was submitted for this site back in November 2016. The deadline for determination passed months ago, but it seems as though the agreed date for determination was changed to September 15 2017 by agreement with the developer. Sadly, no decision has been forthcoming because the site wasn’t even considered at the planning meeting held on 13 September.

There is therefore a risk that the developer will launch a “Non-Determination” appeal just like those that were launched for Grove Farm (Netherhouse Copse) and Cross Farm.

Consequently, we are concerned that the council seems to be missing the deadlines for these major applications.

Full documents on Hart’s planning site can be found here.

Hart Major Planning Site: Grove Farm (Netherhouse Copse)

[Update] This site has been approved for development by the planning inspector [/Update] The third Hart major planning site is Grove Farm (Netherhouse Copse). This is an application for 423 new houses on the site off Hitches Lane in Fleet. The appeal for this site was heard back in July. The Planning Inspectorate had published a document on its website saying the appeal decision would be made public on September 15 2017.

Hart Major Planning Site: Grove Farm (Netherhouse Copse), Fleet, Hart District, Hampshire Appeal Dates

Grove Farm (Netherhouse Copse) Appeal Dates

Sadly, this deadline has not been met. We Heart Hart understands the decision will now be made on or before October 6 2017, although the website is now ambiguous.

Full documents on Hart’s planning site can be found here.

Grove Farm (Netherhouse Copse) Appeal

Grove Farm (Netherhouse Copse) Appeal

We can live in hope that the Government’s announcement on the new housing need methodology will influence the decision in a positive way.

Hart Major Planning Site: Cross Farm

[Update] The appeal and planning application have been withdrawn] Finally, we have Cross Farm. This is an application for a 160-unit care village in Crookham Village. This was supposed to be determined a few months ago. The council failed to make a decision on time and the developer launched an appeal. The council did say it would fight the appeal, going against it’s own draft local plan.

Hart Major Planning Site: Cross Farm Appeal withdrawn

Cross Farm Appeal withdrawn

However, it now appears as though the appeal has been withdrawn, so it isn’t clear whether the site will be in the next version of the Local Plan or not.

Full documents on Hart’s planning site can be found here.

Conclusion

All in all this is mixed news for the Hart major planning sites. First of all, we are pleased Hartland Village has passed one of the planning hurdles. Yet, we are concerned about the lack of decision on Pale Lane (Elvetham Chase). It is frustrating that no decision has been made in the Grove Farm (Netherhouse Copse) appeal. Finally, the Cross Farm application seems to be in limbo, with no formal decision by the Council and the withdrawn appeal.

We do hope that the three green field sites are dropped as a result of Hart’s housing ‘need’ being reduced due to the new Government methodology.

 

New Government methodology to reduce Hart housing need

Time to celebrate reduction in Hart housing need

New Government methodology reduces Hart housing need

Yesterday, the Government published a consultation (Planning for the Right Homes in the Right Places) on its proposals to simplify and standardise the calculation of housing need. The good news is that Sajid Javid’s new  methodology, if adopted, will result in a significant reduction in Hart housing need. There are also reductions for Rushmoor and Surrey Heath.

Significant reduction in Hart Housing need

Government Housing Need Consultation results in reductions for Hart, Rushmoor and Surrey Heath

Impact on Hart Housing Need

If this proposal was adopted, the full housing requirement for Hart would fall to 6,132 new dwellings. This compares to the Hart’s current Local Plan total of some 10,185 and the total outlined in the Strategic Housing Market Assessment (SHMA) of 8,022. The new target of 6,132 is above the 5,144 we recommended in the recent Local Plan consultation. But, clearly, if the new figure of 6,132 was adopted, we would welcome it.

The Government now calculates housing need on the basis of the most up to date demographic projections. They then add an adjustment for suppressed households and affordable housing. The affordable housing adjustment is based on local house prices compared to local earnings.

This vindicates the stance we have been taking for years now: Hart’s housing target is ridiculous. The current SHMA takes out of date demographic projections and makes lots of spurious and arbitrary adjustments that don’t address the needs of the district. Then Hart Council added a further 2,000 houses to that. This new approach proposed by the Government is much more sensible.

Impact on Rushmoor and Surrey Heath

This is also good news for Rushmoor and Surrey Heath. Rushmoor’s overall housing target reduces by 2,982 houses. Rushmoor has already said it can meet it’s current target, so this leaves it with significant extra capacity.

Surrey Heath’s target reduces by 630 houses. Surrey Heath has said it will endeavour to meet its current housing target, but if it can’t, then Hart and Rushmoor would be expected to make up any shortfall. Previous estimates of their shortfall were around 1,400 houses. These new proposals make any problems Surrey Heath has much easier to solve.

Taken together, these reductions are very welcome and reduce the risk that Hart will be forced to take any overspill from Surrey Heath.

Impact on the Hart Local Plan

There is further good news. If the current Local Plan is more than five years old or if the new Local Plan is not submitted by 31 March 2018, then the new methodology must be used. This means that Hart should start considering this new methodology immediately.

Impact of new housing need methodology on Hart Local Plan

Impact of new methodology on Hart Local Plan

If the new methodology was adopted, then the Hart housing need drops and Hart would need to build far fewer houses. According to the recent Local Plan consultation, a total of 5,594 houses have already been built or planned for as of January 31 2017. This would 600-700 houses left to plan for, maybe a few more to give scope for taking Surrey Heath over spill. In round numbers, let’s assume 1,000 houses left to plan for. Planning for a few more houses than those demanded by the standard method would mean that the Inspector would have to work on the assumption that the Plan was sound.

New Government housing methodology - impact on planning inspectors

New Government housing methodology – impact on planning inspectors

This could be easily made up from brownfield sites in the draft Local Plan. Sun Park (320) and Hartland Park (1,500) would more than meet the remaining need, with plenty of room to spare. This would mean Hartland Park could be built at a slower rate.

The implication of this is that we would need no new settlement. No building at Murrell Green, no new settlement at Winchfield or at Rye Common. Furthermore, Pale Lane (Elevetham Chase) and Cross Farm wouldn’t be required. It remains to be seen whether the inspector will take account of this new methodology to save Netherhouse Copse (Grove Farm) in the current ongoing appeal.

Impact on Neighbourhood plans

In a further piece of good news, the Government proposes that the way housing need in Neighbourhood plans is calculated should be simplified. It says that it should be based on the proportionate population of the Neighbourhood planning area.

New Government housing methodology - Neighbourhood plans

New Government housing methodology – Neighbourhood plans

This is essentially the same proportionate method that we have been advocating for some time. It will finally mean that David Cameron’s promise that local areas should not simply have new housing estates dumped upon them will be met. This proposal will also effectively mean that existing urban areas should become more dense. This is another policy we advocated in the recent consultation.

Note of caution

So far, this is just a consultation and is not yet adopted. There is therefore a risk that developers will seek to water down the proposals or amend them. We have done a quick analysis of the Government spreadsheet and that shows that roughly half of Local Authorities have had their targets increased and roughly half have seen a reduction. Overall, the housing need identified by the Government is about 266,000 houses per annum, in line with previous estimates of overall national requirements. So, in our view, developers don’t have much of an argument – the proposals seem to redistribute the housing targets where they are most needed.

Moreover, there are some potential pitfalls in planning for certain groups such as the elderly and affordable housing in paras 89 & 90. However, this is really about how to get the total to add up, rather than changing the total.

Conclusion

Overall, we think that if these proposals are adopted it is very good news for Hart, Rushmoor and Surrey Heath. The new Hart housing need would be very achievable and would save many of our precious green fields that are under threat.

We would urge you to respond to the Government’s consultation and give it your support.

We also expect the council to set to work immediately to revise the draft Local Plan to take account of these new developments. This should be easy. They are already planning for far more houses than we need, so striking out the controversial green field developments should be a relatively simple task.

 

 

 

 

Hart fails to decide Cross Farm application on time

Sad clown at Hart council fails to decide Cross Farm Appeal document 16/03400/OUT

Hart Council clowns fail to decide Cross Farm application

Hart Council has failed to decide the Cross Farm in Crookham Village planning application on time. This has led the developers to submit an appeal on the grounds of non-determination. This comes on the heels of the failure to determine the Grove Farm (Netherhouse Copse) application back in December 2016.  This is Jedi-level incompetence that makes the Council look like clowns.

The original application was made in January this year and should have been decided by 7 April. The application doesn’t seem to have been considered at all by the Planning Committee. Details of the original application for the Cross Farm development can be found here, and searching for 16/03400/OUT. The appeal documents can be found by searching for 17/00078/NONDET.

The proposed Cross Farm development in Crookham Village was one of the recommended sites in the recent Local Plan consultation. This indicates that the proposal was supported by officers.

We can only guess at why it wasn’t determined on time. Clearly,  the council is dysfunctional. The Conservatives were in charge of the council when the application should have been decided. However, Community Campaign Hart (CCH) held the chair of the Planning Committee at that time. Now the Planning Committee is chaired by Graham Cockarill of the Liberal Democrats, and the administration is jointly run by CCH and Lib Dems. Therefore, it seems none of the parties are able to get a grip on the planning process and take decisions on time.

One explanation might be that despite Cross Farm being in the draft Local Plan, CCH councillors felt unable to support the proposals. Therefore, they abdicated responsibility, so they could blame any decision on the Inspector. Of course, the appeal will be at council taxpayer expense.

[Update] Another explanation might be that it wasn’t in the interests of the Tory administration or the officers to bring this to the Committee on time. Cross Farm in Crookham Village was a preferred site in the draft Local Plan. If Cross Farm had been rejected at Committee, it would have effectively scuppered the Local Plan. [/Update]

Cost of Cross Farm, Crookham Village appeal

It is likely that this public enquiry style appeal will cost the council over £100,000 to defend. We find it difficult to understand how they expect to win the appeal given that the site is in the draft Local Plan. Therefore, we think it likely the inspector will award costs to the developer should they win. This would bring the total costs of the appeal to over £200,000.

The overall council budget is ~£10m. Surely, this appeal money could be better spent on local services, infrastructure or social housing?

 

Challenge the ridiculous housing target in the Local Plan Consultation

Challenge the ridiculous housing target

Challenge the ridiculous housing target in the Local Plan consultation

The main objection to the draft Local Plan is the ridiculous housing target. We believe the Strategic Housing Market Assessment target of 8,022 is too high. Despite that, Hart have added more than 2,000 houses to this target and plans to build 10,185 houses.

This puts massive pressure on the district and puts many greenfield sites such as Murrell Green, Winchfield, Grove Farm (Netherhouse Copse), and Pale Lane (Elvetham Chase) at risk. Moreover, this rate of housebuilding will be carried forward in future planning periods, making it inevitable we end up with unattractive urban sprawl.

We believe the housing target should be a more reasonable 5,144 which will meet the changes driven by demographic change, immigration and deliver social housing for those who cannot afford to rent or buy their own home. The remaining housing target can be met from brownfield sites alone.

The detail of our analysis is shown below. Please object to this ridiculous housing target by downloading the link below and review our suggested comments on the draft Local Plan. Please do make amendments into your own words and submit it to [email protected] before the deadline of 5pm on 9th June 2017. All of the Council’s consultation documents can be found here.

Response to the Hart Draft Local Plan Consultation
Response to the Hart Draft Local Plan Consultation

There are several lines of argument:

  • Vastly Over-achieves against Government housing policy
  • Strategic Housing Market Assessment target of 8,022 is too high
  • Hart’s decision to increase the target by 2,000 dwellings to the target is inappropriate

Vastly over-achieves against Government housing policy

The 2012-based government projections of population and number of households, points to a need of around 215,000 dwellings per annum, compared to recent delivery of 130-170,000 new dwellings each year. It is clear we need to respond to the objective in the National Planning Policy framework to “boost significantly the supply of housing”. To achieve this, it follows that the sum of all the housing market assessments across the country should add up to the total expected increase in households, or a little more to give some margin of safety.

It is worth noting that the DCLG forecasts project forwards the recent high level of inward migration to the UK. Government policy and the impact of Brexit is likely to reduce inward migration so, it is likely the 2014-based projections are too high. Moreover, the DCLG forecasts also assume a reduction in average household size.

The 2016 Strategic Housing Market Assessment (SHMA) has arrived at a ‘need’ of some 8,022 new dwellings over the plan period.

For Hart, the raw 2014-based DCLG forecasts, as opposed to the 2012-based forecasts used in the SHMA,  would result in a starting point for housing need of c. 4,473 new houses (see Figure 6 of the SHMA).  Hart’s overall housing requirement as defined in the SHMA is some 79% above the starting point. The ridiculous housing target of 10,185 used in the Local Plan is some 127% above this basic requirement.

If this were applied across the whole country, then we would be allocating land and allowing the building of some 488,000 new dwellings each year, far above the national requirement. This goes against latest planning guidance that states that housing need should be “principally understood as a measure of future demand rather than aspiration”. Analysis of five other housing needs assessments of planning authorities across Hampshire, Oxfordshire, Surrey and Berkshire reveals an average housing uplift on the starting point projections of around 42%.

There might be some justification if this process had resulted in more house building. But it is clear from a recent House of Lords report that it has not:

Nevertheless, we see the gap between planning permissions and housing completions as a fundamental one in respect of securing increased housing supply. In a climate where over 240,000 homes a year are being granted planning permission, it is a fundamental failure of the development system that over 100,000 fewer homes are actually being built. This situation must be addressed.

We believe that the Government must consider measures to help accelerate the delivery of housing on sites with planning permission, such as permitting the charge of equivalent council tax rates when development has not commenced after a specified period of time, subject to safeguards when there are genuine reasons to prevent the development proceeding.

This is borne out by local experience, where, as of 1 April 2016 there were over 3,000 unimplemented planning permissions, with over 1,000 of those from 2013 or earlier.

The unintended consequence of this policy is effectively state-sponsored profiteering on behalf of the major housebuilders. It is plainly ridiculous that the housing target in Hart’s SHMA and the SHMAs of neighbouring areas are massively above the requirement suggested by demographic change, immigration and changes to household size.  Accordingly, the housing target and the Local Plan should be adjusted downwards to more realistic levels.

Strategic Housing Market Assessment results in a ridiculous housing target

Following on from the above, we can now analyse the reasons why the SHMA has arrived at a ridiculous housing target that is too high. We can also arrive at a more realistic figure.

Inappropriate Starting Point

First, the starting point used is the 2012-based DCLG forecasts, or around 5,334 dwellings over the plan period. The starting point should be revised downwards by using the more up to date 2014-based forecasts which would result in a starting point of 4,473 dwellings.

The SHMA then uplifts the starting point in response to market signals to provide more housing for what are termed suppressed households. These are, for instance younger people in the 25-34 age bracket who are still living with their parents and are unable to afford to form their own household. Almost by definition these people cannot afford to rent their own accommodation or buy their own house. The SHMA suggests a 15% uplift on the start-point. Even though some element of household size reduction is included in the DCLG forecasts. We would agree with this and increase the need by 671 units to arrive at a total housing need of 5,144. However, we would insist that these units are delivered as social rented housing. The proposed Hart Development Corporation could be an appropriate vehicle to deliver these homes, or partnerships with local Housing Associations.

Affordable Housing Uplift

The SHMA then makes a further upward adjustment for affordable housing. This is to help those able to afford to rent, but not able to access home ownership. By definition, these people are already housed. It is therefore difficult to see how building more houses will assist these people. If they can afford to rent, then it is very likely that they can afford to service a mortgage, but cannot afford a deposit. The way to help these people is with shared ownership or ‘Help to Buy’ schemes. It is also worth noting that some of these people may be taking an entirely rational decision to rent and not buy because they think property prices are too high and thus represent a poor investment when assessing potential future returns.

The only plausible reason to build more houses to help these people would be that it would lead to a general fall in house prices. This is a false premise as discussed by Ian Mulheirn of Oxford Economics here.

The extent that we do see high house prices as a policy priority in and of themselves (e.g. for wealth distributional reasons), this is not a problem that will be solved by any plausible amount of new supply. Many econometric studies in the UK (see page 43 here for a comparison of results) have concluded that a 1 percent increase in the housing stock per household will only cut prices by at most 2 percent. Consequently, even if we were to add 300k new houses per year (about 150k in excess of household formation, approaching 0.5 percent of current stock), this would only lower prices by about 1 percent per year. This is peanuts in the context of price rises over the past 20 years….

Building many more houses that people want to live in is a dangerous route to go down, as Spain and Ireland can attest. For comparison, Ireland had an estimated surplus of dwellings over households of around 14 percent on the eve of the financial crisis (which among other things proves that households don’t just form because there are vacant houses). This building mania was something like the equivalent, relative to stock, of the UK adding 1 million new dwellings per year from 2002–11. But even this didn’t do anything noticeable to rein in Ireland’s property market during the boom, with prices rising by a fair amount more than the UK’s. A similar story can be told in Spain.

Therefore, the affordable housing need should be seen as the proportion of overall housing need that should be built as ‘affordable’ units. The SHMA adds 504 extra affordable units to the total housing requirement. However, this 504 units represents only 11.2% of the 4,473 raw housing need. Hart’s target is to build 40% affordable housing and recent delivery has averaged just over 20%. If this were to continue and the housing target were revised to start at 4,473, then around 900 affordable homes would be delivered in addition to the 671 social rented units identified above.

Jobs Growth Adjustment

Finally, the SHMA makes a further increase to the housing target to take account of future jobs growth. There are several issues with this adjustment.

First, the jobs forecasts made by outside bodies are simply taken as read with no analysis or critique. We know they are wrong simply by looking at the forecasts in Appendix D. These show the number of jobs in 2015 to be in the range 158-174K depending upon which forecasting house is used. However, the latest BRES data for 2015 shows the total number of jobs to be 143K for the Housing market area, a shortfall of 15-30,000, or almost all the projected job growth.

Second, the projection of 1,200 jobs per annum is far more than the 1998-2015 average of 1,029, and the report itself states that it is unrealistic to expect recent jobs growth to continue at the same rate.

Third, the SHMA uses a very circular argument to account for the number of jobs. The argument is: the forecasts say you should have 1,200 extra jobs per annum in the HMA. They then acknowledge the forecasts are unachievable because there won’t be enough people of working age to fill those jobs.

They then decide we will need to import some extra people and those people will need houses. The SHMA then acknowledges that most of these people will work outside the district. This is borne out by the M3 LEP Strategic Plan, which does not identify any part of Hart as either a ‘Growth Town’ or a ‘Step-Up Town’, so will be starved of investment. Moreover, the Employment Land Review (ELR) describes Hart’s office space as:

There appears to be an over-supply of lower grade stock with concentrations of dated, larger footprint, stock to the north of the town centre, specifically at Ancells Business Park, which is currently experiencing relatively high levels of vacancy.

Hook office space similarly experiences high vacancy rates and there is strong interest in office to residential conversion.

Commercial agents note that the costs of refurbishing such stock to a good standard attractive to the market typically costs between £50-£60 per sq ft; and that the current over-supply of office accommodation limits investment in refurbishing such stock as low rent levels made such investment unviable.

Clearly, this uplift is not an expression of the ‘need’ for the district, nor is it ‘sustainable development’. The SHMA itself recognises that most of these additional people will, in fact, work outside the district. This is against the sustainability principles of the NPPF.

Essentially, we are being asked to concrete over our green fields to build houses for people who might move into Hart to fill fictitious jobs, that someone thinks might be possible to create in Hart. Then those people will add to the strain on Hart’s infrastructure (roads, schools, healthcare), but work outside the district. This is not ‘sustainable development’ on any reasonable interpretation of the phrase. Moreover, those exporting districts should already be planning to house those people.

Accordingly, there should be no jobs growth uplift in the SHMA.

This leaves us with a housing need for Hart of 5,144 made up of 3,573 open market units, 671 social rented units and 900 affordable homes made available through ‘Help-to-Buy’ or shared ownership.

Hart’s decision to increase the target by 2,000 dwellings results in a ridiculous housing target

It follows from this that Hart’s decision to add a further 2,000 units to the SHMA to establish an alleged ‘policy on’ ridiculous housing target of 10,185 is both specious and unnecessary:

  • The needs of both suppressed households and those who can rent, but can’t buy are already met by the revised housing target identified above
  • The addition of a further 2,000 homes would simply import even more people into Hart, most of whom would work outside the district, again contrary to the sustainability principles of the NPPF.
  • There is no evidence that this level of development would lead to falling house prices. Indeed, with residential land priced £4.1m per hectare (SHMA section 9.12) and a density of 30 dph, land prices alone would amount to £133,000 per dwelling. Build costs, S106 contributions and developer profits would see average house prices around £400,000.
  • It is not at all clear why we must build 2,163 extra houses to meet an alleged additional affordable housing need of 865
  • Rushmoor has already said it can meet its share of the over-inflated housing target. Reducing the overall SHMA targets for the whole Housing Market Area (HMA) will release pressure on both Surrey Heath and Rushmoor, such that ‘additional flexibility’ is not required
  • We are currently living in the most benign conditions for housebuilding in living memory. We are experiencing low absolute interest rates and negative real interest rates. The markets are awash with excess capital thanks to Quantitative Easing and the planning regime is very favourable to developers. As the House of Lords report referred to above indicates, planning permission is being granted at a much faster rate than new homes are being built. The only conclusion one can draw from this is that the market cannot absorb many more houses than are being built without a major fall in house prices. The house builders will not build faster as it will damage their profitability. Simply granting permission for more housing through blighting more of our green fields will not impact house prices nor will it lead to more houses being built.

It would be appropriate for the Inspector to express an opinion on the ridiculous housing target in the SHMA and the extra 2,000+ houses. Hart should set out a ranking of sites it wishes to take forward, such that the spatial strategy can be easily adjusted depending upon the final housing target that is agreed.

FOI request reveals Winchfield failed testing

Flood Taplins Farm Lane 28 March 2016 shows why Winchfield failed testing

Flood risk means Winchfield failed testing

The documents that reveal why Winchfield failed testing have been revealed by persistent efforts from Winchfield Action Group. A Freedom of Information request has revealed the results of a new testing document. The full document can be downloaded on the link below.

In summary, the main issues were impact on:

  1. Historic Environment
  2. Bio-diversity
  3. Landscape
  4. Water Quality
  5. Flood risk

However, in our opinion, the impact of flood risk was massively downplayed in the report. More detail is given in the analysis below. Moreover, some of the alleged positives in the report are also complete nonsense.

For instance, they claim that building a “renewable and low-carbon energy generation and transfer” plant will diversify energy supply. What they mean is expanded upon in the Sustainability Assessment – they mean building a wood-burning power station utilising locally sourced timber (p74). Such a plant would be extremely undesirable since burning wood produces more CO2 than burning coal, and none of the proposed master plans include such space for such a plant.

They also claim that building 3,000 new houses, with associated traffic will somehow “reduce the
emissions of greenhouse gases and manage the impacts of climate change”. Again, complete and utter nonsense. They completely ignore research that shows higher density development in urban areas is much more sustainable than green field development.

This leaves the Local Plan in something of a pickle. Their preferred green field site of Murrell Green has been severely impaired by the presence of a Major Accident Hazard pipeline and their obvious second choice is not viable.

This puts at risk the other green field sites in the district, namely Pale Lane (Elvetham Chase) and Netherhouse Copse (Grove Farm). At the same time, Hart Council is seeking to protect our brownfield sites from redevelopment. These problems arise because they are proposing a ridiculous housing target of over 10,000 dwellings.

This is our chance to shape the draft Local Plan that is currently our for consultation. Our suggested comments can be found on the link below. Please do download and review them. Please do make amendments into your own words and submit it to [email protected] before the deadline of 5pm on 9th June 2017. All of the Council’s consultation documents can be found here.

Response to the Hart Draft Local Plan Consultation
Response to the Hart Draft Local Plan Consultation

Detail of how Winchfield failed testing

Winchfield SHLAA Sites in Hart District Hampshire

Winchfield SHLAA Sites in Hart District Hampshire

First, they say there was some evidence of wet ground at the far east of SHL183, but “no other obvious evidence of current or past flooding”.

Winchfield Strategic Assessment - Flood Risk 1

This is of course complete nonsense. The detailed assessment also says there’s only a one in 30 year chance of surface water flooding. The area of Taplins Farm Lane near the railway bridge flooded three times in 2016 alone. The image at the top of this post documents just one of those events. The posts documenting the flood events can be found here (4 Jan) , here (7 Jan), here (9 March on Station Road) and here (28 March due to #StormKatie).

They seem to gloss over the flood risk being over 55 on a 74 point scale for five of the eight SHLAA sites they consider.

Winchfield Strategic Assessment - Flood Risk 2

Winchfield Strategic Assessment - Flood Risk 3

Winchfield Strategic Assessment - Flood Risk 4

Winchfield fails testing – Strategic Assessment
Winchfield fails testing – Strategic Assessment

Motion of No Confidence in Hart District Council submitted

Breaking News: Motion of No Confidence submitted in Hart District Council

Motion of No Confidence submitted in Hart District Council

A motion of no confidence in Hart District Council has been submitted by Community Campaign Hart (CCH), (or as some call them Completely Concrete Hart) and the Liberal Democrats.

Apparently, they are unhappy that a new settlement at Winchfield has not been included in the Local Plan. They plan to push for Winchfield to be re-included if they manage to take over.

Community Campaign Hart (CCH) screwing up Hart Planning since 2004

We think this is a bad idea for a number of reasons:

  1. This will add extra delay to the Local Plan process, adding to the risk that sites like Grove Farm (Netherhouse Copse) and Pale Lane (Elvetham Chase) will be given the go ahead at appeal before the Local Plan can be put in place
  2. Winchfield has failed testing. The main issues with the proposal are:
    • groundwater and surface water flooding,
    • Cost of new road infrastructure and the need to travel to Fleet for main services
    • requirement for new wastewater treatment works
    • too much delivery risk concentrated in one site
    • impact on landscape
    • impact on heritage assets and SSSIs
  3. CCH have completely failed to oppose the main issue: we are being asked to build too many houses. Hart Council have arbitrarily added an extra 2,000 houses to the already inflated SHMA figure of 8,000, giving a total over 10,000 houses. Tackling this would mean we don’t need a new settlement at Winchfield or Murrell Green, nor would we need Pale Lane or Grove Farm
  4. A new settlement at Winchfield will likely have a major impact on congestion in Church Crookham and the western edge of Fleet.

We predict a stormy council meeting on 25 May.

[Update  – Statement from Conservative Council Leader]

Conservative Council Leader Stephen Parker commented:

We have a clear track record of success in running Hart Council. Despite cuts to Hart’s government funding we used Conservative ministerial contacts to reduce the cuts, froze Council tax for 6 years and made minimum increases for the last two years. At the same time we made innovative partnerships to make sure that no cuts were made to our services or to our support to the voluntary sector. We delivered the new Hart Leisure Centre, a superb facility which pays for itself with no increases to Hart’s Council tax. We listened to residents in making our Local Plan which maximises use of brownfield sites and protects our towns and villages from unwanted expansion. At no time in the last eight years of Conservative leadership have they challenged any of these successes. Residents will no doubt look forward to reading their joint manifesto.

[/Update]

[Update 2 – statement from CCH]

Statement about motion to bring about a vote for Council Leader

Until fairly recently Hart District Council had a democratic process of electing the council Leader every year at the AGM. This right was taken away by the then Conservative administration, presumably because they realised that as is the case now there would be times when they did not have a majority on the council.

The Conservatives forced through the instigation of a 4 year term for the council Leader, the maximum period they could have gone for without falling foul of legislation.

Out of 33 councillors there are 14 Conservative, 10 Community Campaign, 8 Lib Dems and 1 Hook Independent. No one party have the 17 councillors required to hold a majority on the council.

The Community Campaign have asked the current Leader if he’d be willing to continue as Leader with a proportional Cabinet made up of 3 Conservatives, 2 Lib Dems and 2 Community Campaign members. Given the proportionality of such a Cabinet it does not seem to be an unreasonable request.

We await his response. However, should the Conservatives not wish to work with a cross party partnership then we believe that the Council should have the right to elect a new Leader.

The nature of the council’s constitution is such that in order to bring about the opportunity to elect a new Leader a motion to withdraw support for the current leadership needs to be lodged 7 clear working days before the council’s AGM.

The full motion moved by Cllr. James Radley of the Community Campaign reads;
The council wishes to use this AGM, as it represents the traditional point in the municipal year, to undertake a vote for the leader of council. To bring about such a vote the constitution requires that a vote to remove the current leader first be tabled. To this end this council retracts support for the current leader and does so as required by the constitution by voting to ‘remove from office the current Leader of the Council and agrees that a new Leader should be elected forthwith’.

[/Update 2]

[Update 3: Lib dems tweet to say they don’t support new settlement at Winchfield]

NE Hants Lib Dems statement about Winchfield

[/Update 3]

Where is the draft Hart Local Plan?

Hart Local Plan - Keep Calm and Wait until 26 April

Hart Local Plan – Keep Calm and Wait until 26 April

Regular readers maybe wondering what has happened to the Hart Local Plan. On February 9th, Hart Cabinet agreed to a spatial strategy as part of the draft Local Plan that was due to go out to consultation in March. Obviously, there have been further delays. This is what we now understand to be the position:

Hart Local Plan timetable

The draft local plan will be released 26 April for a six-week Reg 18 consultation period after a briefing session with Parish Councillors on the 25th. There will be roadshows at the main settlements. Every house in the district will receive an A5 leaflet advising them of the consultation.

The Reg 19 process will follow in about November with submission of the full plan to the Secretary of State in mid-February 2018. All responses during the Reg 18 will be made public including the names of the individuals but with no contact details.

Hart Local Plan Headlines

Hart Council have decided to build 10,185 houses up to 2032 of which around 50% have already been built or granted permission. Please note that this number is far higher than 8,022 target the recently published Strategic Housing Market Assessment and more than double the requirement generated from demographic change. The numbers are now correct as of 31 January 17 and include all office conversions which have been approved.

Housing Numbers by area

  • Fleet 200 – mostly through office redevelopment
  • Hook was 200 now 10 from office redevelopment plus another 87. However, developers may chance their arm again with Owens Farm (750), and of course around half the Murrell Green site is in Hook Parish.
  • Sun Park 320
  • Hartland Park (Pyestock) 1500. Fleet town council have apparently made the point that the site offers only 20% affordable homes and the density per hectare is up to 97 in places which is equivalent to city centre densities which is of concern to them. OUr view would be to make the most of available brownfield sites.
  • Murrell Green 1800 but with challenges. There are 4 promoters and it will be some 3 to 4 years before planning permission is approved. It includes the site for a secondary school but there won’t be enough developer contributions to pay for it. New school funding rules mean that Hampshire can’t pay for it either.  It’ll probably be an Academy at a cost of circa £36 million. So we get a site for a school, but no money.
  • Crondall 66
  • Crookham Village 100 + 64 predominantly the care village
  • Eversley 124 on two sites
  • Heckfield 86
  • Long Sutton 10
  • Odiham 119 as per NP
  • Hartley Wintney 0. It seems odd that HW’s Neighbourhood Plan will be ignored. It should be noted that Murrell Green directly abuts Hartley Wintney Parish and about half of the proposed Pale Lane (Elvetham Chase) development is in HW parish.
  • South Warnborough 34 on two sites
  • Yateley 88
  • An additional 50 via rural exceptions and a further 290 from windfall.
  • Interestingly, no mention of Winchfield, or their Neighbourhood Plan, but roughly half of Murrell Green is in Winchfield Parish.
  • Apparently, Bramshill will be very difficult to develop because of all the complications with the Grade 1 listed site.

Other news

Apparently East Hants have done such a stellar job on the Local Plan, the Planning Policy team is now back in house at Hart, reduced in size from 8 to 2.

There is a risk that developers will continue to pursue Pale Lane and take it to appeal before the Local Plan is adopted.

We await the results of the Grove Farm (Netherhouse Copse) appeal in June.

Hart Tories claim victory despite abject failure

Hart Tories (NE Hampshire Conservatives) claim victory despite abject failure

Hart Tories (NE Hampshire Conservatives) claim victory form abject failure

North East Hampshire Conservatives have managed to claim victory, despite their abject failure to plan for a sensible amount of housing for Hart District.

On Thursday, the Conservative led Hart Cabinet agreed to plan for more than 10,000 houses. This is many more than is required to meet the needs of Hart residents. Yet, because they have managed to avoid putting those houses near Fleet, they claim it as some sort of victory. They show no concern for Hart residents who live in the more rural areas.

Apparently, the Hart Tories are concerned about over-development, transport, traffic, education, loss of green space and the impact of development on existing infrastructure. But only in the immediate area around Fleet. The rest of us will just have to suffer.

To recap, to meet the demographic projections for Hart residents and meet the needs of those who can’t get on the housing ladder, we need to build 6,000-6,500 new dwellings. Anything over and above that requires massive in-migration to Hart. That is, massive in-migration of people whose housing needs are supposed to be met elsewhere. The SHMA also assumes that most of these people will work outside the district, putting even further pressure on local infrastructure.

Hart is planning for more than twice the demographic projections. They are not alone, other nearby districts are planning for 42% more houses than the demographic projections require.

However, their so-called victory may be short lived. The Grove Farm application is being appealed by the developers. The Planning Committee also has to make a decision about Pale Lane soon. It seems likely that they will turn it down. However, it seems equally likely the developer will appeal that decision too. With no Local Plan, out of date policies and a questionable 5-year land supply, the inspector may well grant permission for both these sites.

The only sensible way out of this, is to remove the extra 2,000 houses they voted through on Thursday and demonstrate that the houses are not required.