CPRE Hampshire host event on protecting Hart countryside

CPRE Hampshire event on protecting the countryside in Hart and Rushmoor

CPRE Hampshire event on protecting the countryside

CPRE Hampshire are hosting an event about protecting the countryside in Hart and Rushmoor.

The event is free and everybody is welcome, so please do attend if you can. However, you need to book in advance so they can organise catering.

The event is taking place at the Church on the Heath, Elvetham Heath, Fleet GU51 1HA at 7pm on 24th October 2018.

You can book by following the link to www.cprehampshire.org.uk or phoning them on 01962 841897.

The full leaflet can be downloaded here.

Fleet regeneration is feasible without taxpayer funding

Fleet Regeneration: Hart Shopping Centre Design Study

Fleet Regeneration: Hart Shopping Centre Design Study

We are delighted to announce the release of a study into Fleet regeneration undertaken on behalf the Rural Hart Association. This study shows that it is feasible and desirable to redevelop Hart Shopping Centre as a stepping stone to wider Fleet regeneration.

Benefits of Fleet Regeneration

The benefits of the proposed scheme are as follows:

  • 371 flats of 1, 2, 3 and 4 bedrooms, with 20-40% affordable, ideal for first time buyers. It is possible that some of the units would be attractive to the private rented sector.
  • Potential for some of the unit to be sheltered housing for our growing elderly population.
  • Extra customers for local Fleet businesses including retail, restaurants, bars, photographers, hairdressers, mobile phone shops etc, bringing an extra ~£3m per year of spending to the town centre.
  • Provision of a cinema for film lovers.
  • Provision of a community space for local cultural events.
  • Modern retail units for a supermarket and to attract High Street retailers, benefiting existing Fleet residents. Although there is an option to increase the number of homes and have less retail space if necessary.
  • Underground car-parking.
  • The scheme will no doubt make contributions to fund infrastructure in Fleet.
  • Supports Fleet Town Council’s objectives to bring cultural and entertainment facilities to Fleet Town Centre as outlined in the Fleet Neighbourhood Plan.
  • Help Hart Council address the challenge of bringing investment to Fleet, as outlined in the Hart Local Plan.
  • The scheme would be profitable in its own right and would not require any contribution from Fleet or Hart taxpayers.

The proposals respect the sight lines of the existing Hart Shopping Centre, so it shouldn’t be intrusive.

The savings for Fleet taxpayers would run into £10’s of millions as they would no longer be on the hook for the controversial Gurkha Square development. The savings for Hart taxpayers would include the £1.5m for planning the unnecessary new town, and of course they would retain the Gurkha Square parking revenue.

Background to Fleet Regeneration Proposals

The genesis of this idea came at the January Council meeting, where the Graham Cockarill, portfolio head of Planning said they were pressing ahead with the unnecessary new town, because the regeneration of Fleet was an “impossible pipedream”. These proposals should give Hart Council food for thought. We would strongly recommend that Hart takes these proposals seriously and get behind a plan to regenerate Fleet. Together we can make a vibrant town and help Hart remain one of the best places to live in the country.

Next steps for Fleet Regeneration

These proposals will be formally submitted to Hart Council and Fleet Town Council early this week. We are also seeking for these proposals to be discussed as part of the upcoming Local Plan examination.

We think these proposals could be viewed as the first project of a larger programme to regenerate Fleet. The next site on our own target list would be the whole Civic area including Hart’s Offices, the library and the Harlington. There should be no need to disturb either Gurkha Square car park, or Bakers. The Fleet neighbourhood plan also targets this area for improvement. It is time for Hampshire, Hart and Fleet councils to get round the table with sensible planners like Lambert Smith Hampton to come up sensible plans for the future.

This is a much better idea than to concrete over our green fields with an unnecessary new town.

Rural Hart Association email to supporters about Fleet Regeneration

Dear Supporters

The Rural Hart Association (RHA) has made very good progress over the summer and we are now fully prepared to play our part in opposing a New Town at the Examination in Public (EIP) which starts on 20 November.

You will remember that the RHA decided to concentrate its resources on the single issue of Fleet regeneration. We set out to demonstrate that it was feasible for Fleet Town Centre to be regenerated with a mixed-use development (residential, retail and leisure) which would provide housing as well as reviving the commercial viability of Fleet as Hart District’s largest town.

The issue of Fleet Regeneration is of vital importance because Hart District Council’s justification for a New Town rests on their assertion that it can’t be done. In a bit more detail the argument runs like this:

  • The National Planning Policy Framework (NPPF) requires that  Brownfield sites are used to their maximum potential before building on greenfield land
  • The NPPF also requires that councils regenerate their Town Centres. NPPF para 86 says “Planning policies and decisions should support the role that town centres play at the heart of local communities, by taking a positive approach to their growth, management and adaptation”
  • HDC admits that Hart District is failing commercially (because there is a growing net outflow of retail and leisure spend from the district)  and the Local Plan states (para 66) that “the challenge for Fleet will be to secure investment so that it can compete with the comparison towns in neighbouring districts”
  • But HDC has made no attempt to secure the investment needed to regenerate Fleet. When challenged on this at the January council meeting HDC stated that regeneration of Fleet was an “impossible pipedream”.

In May we appointed Lambert Smith Hampton to undertake a Design Study to investigate the feasibility of a mixed-use regeneration of Fleet’s Hart Shopping Centre. This study is now complete and the main conclusions of the Study are:

  • Hart Shopping Centre can be regenerated to provide the same retail and parking space, as well as 950sqm of community space, a multi-screen cinema and 371 flats (of 1,2 and 3 bedrooms). The whole area would become modern and desirable, and the flats would provide a tremendous boost to the viability of the shopping centre.
  • The flats would be ideal for first time buyers and elderly people because they are close to the shops and the station – the Design Study has allowed for the full 40% affordability provision.
  • The return on investment for potential developers looks good.

In summary, we have demonstrated that Hart’s claim that Fleet cannot be regenerated is utterly wrong. Hart Council is dominated by CCH councillors whose agenda is to stop Fleet being regenerated at all costs. As a result the draft  Local Plan condemns Fleet in particular (and the whole Hart in general) to long-term economic decline.

We hope that on the basis of this Study, the Inspector will insist that the New Town is removed from the Local Plan and that a large-scale regeneration of Fleet is undertaken instead. Hart should be guiding the district towards a bright future in which Fleet becomes a modern, vibrant and highly successful town surrounded by beautiful countryside and rural villages.

LSH will submit the Design Study to Hart District Council, and will ask the Council to cooperate in its implementation. We will also submit the Design Study to Fleet District Council, whose Neighbourhood Plan supports mixed-use developments in the Town Centre. LSH will also submit the Design Study to the Inspector in preparation for the Inspector’s review of the Spatial Distribution of Housing (Matter 4) and Town Centre and Retail (Matter 10).

You can find the full study in David Turver’s excellent WeHeartHart website at www.wehearthart.co.uk. The We Heart Hart blog also provides a full commentary of the progress of the Local Plan and its well worth reading.

Thank you all for your generous contributions to the Design Study and to funding LSH to attend the Examination in November/December. I think that we have built a very strong case, and I believe that we have a good chance of preserving all of our green fields for many decades to come.

Tristram Cary
Chairman Rural Hart Association

Hart CEO breaches Government guidance on housing need

In an email to councillors, the joint-CEO of Hart Council has made a desperate attempt to justify the Council’s inflated housing requirement in the Local Plan. This justification breaks Government guidance on when to build more than indicated by the standard method.

This comes after the release of ONS figures showing reduced household growth in Hart. By our calculations, we already have sufficient housing supply to 20141 and beyond without an unnecessary 5,000 house new town at Winchfield/Murrell Green.

In summary, he uses bluster, imaginary new ONS releases, unstarted Government consultations and dodgy logic to try to justify why the housing requirement will go up, when in fact the ONS figures show it is going down.

We are in the ridiculous position of the council arguing that we should keep an inflated housing requirement and build far more than we need to.

Inflated housing requirement breaches Government guidance

This is against Government guidance on when to plan for more housing than the standard method.

When to build more than the standard method

When to build more than the standard method

  1. There is no funding in place to promote growth. No part of Hart is identified by the M3 LEP as a growth area that will attract investment
  2. There are no strategic infrastructure improvements planned. In fact Hart has a massive infrastructure funding deficit. Extra houses will make this worse.
  3. Rushmoor is already planning for far more houses than it needs. The new ONS projections mean Surrey Heath can meet its own needs in full.

So, Hart meets none of the criteria to justify building more than the standard method says.

However, the council is breaking with this guidance and planning to build even more houses in the new town. They are proposing to spend £1.5m of public money to press on with it anyway.

Below we reproduce the email in full, together with our comments in red.

Hart CEO email to councillors

Dear Councillors, last night we received questions about the implications for the local plan and the assessment of Hart’s housing needs following the sharp fall in household projections as reflected in recently published Office of National Statistic (ONS) projections on 20th September 2018.  The household projection data is a key input into the new standard method of assessing housing need, and the new figures have prompted dramatic drops in many councils’ housing need figures when factored into the standard method.

Graham Cockarill pointed out that this was of concern to the Government and that the Government had delayed the use of the new methodology for calculating housing need because the revised projections undermined the Government’s objective to boost significantly the supply of new homes through building 300,000 new homes per annum.

The Government has issued guidance on how to calculate housing need in this period. This says that although the new standard method is not mandatory, any deviation will be closely scrutinised

Planning guidance use of standard method to calculate housing need

Planning guidance use of standard method to calculate housing need

But it has emerged today that the ONS plans to publish a different version of its figures on 3 December.

Yes, but this new version apparently just puts more detail on the figures released on 20 September 2018, by breaking out the household projections by housing type. There is no suggestion that the overall figures will change.

ONS Household type projections December 2018

ONS Household type projections December 2018

The ONS is also planning to publish a set of variant based household projections in which household formation rates for younger adults (those aged 25 to 44 years) are higher.

They may well be, but we can find no evidence of this in the ONS’ schedule of upcoming releases up to 31 December 2019. If this is going to arrive, then it is beyond the timing of the Local Plan examination and thus cannot be considered.

The ONS’s willingness to publish “variant” projections reflects its acknowledgement of concerns about the new approach taken to drawing up the 2016-based figures. Unlike the 2014-based projections, which drew on data from as far back as the 1971 census, the 2016-based figures were compiled with statistics that only go back to 2001. Critics have said that the new projections thus ‘bake in’ the adverse consequences for household formation of housing under-delivery  in this century.

“Experts” have been predicting that the average household size would continue to fall in line with the experience of earlier decades. However,  the 2011 census showed that this trend had come to an end.  Actual behaviour stubbornly refused to comply with expert opinion. The ONS’ own analysis of its new numbers still shows a reduction in average household size out to 2039. However, the rate of reduction in the newer 2016-based figures is slower than the 2014-based projections. We believe that part of this is down to social change – people are getting married later than in the 1960’s and 1970’s. THe increase in house prices may have played a part, but we already know from Ian Mulheirn’s analysis that building more won’t reduce prices. Prices are mostly driven by ultra-low interest rates.

ONS impact of 2016-based projections on household size

ONS impact of 2016-based projections on household size

In its methodology document, the ONS acknowledges those complaints. It says some respondents to its consultation on the new method thought that using data from only the 2001 and 2011 censuses would be “insufficient”. It says that: “There was a view that only using the 2001 and 2011 censuses would result in a downward trend in household formation for the younger age groups, which in turn would downplay the need for housing for younger people”.

OK. So what. It seems the ONS disagrees with this view, or it wouldn’t have continued with the method it has adopted.

The government has already said that it will consult on adjustments to the way housing need is calculated so it is consistent with delivering 300,000 new homes per year by the mid-2020s and that it will do this “as soon as possible”.

The Government may well have said that, but the consultation has not been launched. In effect, the Government has set a ‘top-down’ target of 300,000 houses per annum. Now the detailed bottom-up work has shown this to be far more than we need, it is trying to find a way of fudging the numbers to arrive back at the number it first thought of. It is inconceivable that such a consultation can be launched, completed and the results analysed before the Hart Local Plan is examined. This might be a risk to the housing target we eventually adopt. However, surely the way to mitigate this risk is to demonstrate flexibility of supply, rather than increase the target. We have already shown that Hart has sufficient supply out to 2041 and beyond, without the unnecessary new town.

In effect therefore, the Government is not running with the current 2016 household projections for use with the standard methodology and as Cllr Cockarill highlighted, the Government’s objective is to boost the supply of new homes and wants to put in a methodology that does exactly that.

This is, at best, a disingenuous statement. The current Government guidance says the national household projections should be used. It isn’t clear which version should be used, but surely it makes most sense to use the most up to date figures.

Planning guidance setting the baseline using national household growth projections

Planning guidance setting the baseline using national household growth projections

The worked examples in the Government guidance are a bit ambiguous. We believe that using the new Government standard method is either:

Hart Household change 2018-2028

Hart Household change 2018-2028

a) 212 * (1+0.4) = 297 dwellings per annum using the capped 40% affordability uplift, or worst case

b) 212 *(1+0.5) = 318 dwellings per annum

Hart Housing Numbers

This compares to the 388dpa used in the Local Plan.

I think we can safely read into this that it means that the overall number of homes to be built is likely to go up rather than down.

There is no justification for this statement. There is already at least 70dpa headroom (or over 1,120 houses in the plan period) between the Government standard method and the Hart Local Plan. And even this elevated housing target does not require the proposed new town to be built. In any event, the best mitigtion for this is to demonstrate flexibility in supply

That was exactly why we included a buffer in our housing needs and until we see what they new “variant”  projections look like it is not wise to make any assumptions about not having to meet our neighbour potential unmet housing need.

The new household projections mean that Surrey Heath can meet its own need. Rushmoor is already planning for far more houses than it needs to build.

We now have the ridiculous situation of the council arguing to keep an inflated housing requirement and build more houses than we need so it can somehow justify keeping the unnecessary new town in the Local Plan.

 

Hart to squander nearly £1.5m on new town planning

Hart set to spend nearly £1.5m on new town planning

Hart District Council set to squander nearly £1.5m on new town planning

Hart District Council has revealed that it is set to squander nearly £1.5m on planning for a new town. The figures are revealed in a paper that is going before Overview and Scrutiny Committee next week.

The figures are buried in Appendix 4 of the document.

Hart District Council to squander £1.5m on new town planning

Hart to squander nearly £1.5m on new town planning

The real level of spend will be higher, because the proposal does not include a cost allocation of existing staff on the payroll. The annual budget of Hart is in the region of £10m. So, this level of spend represents a very significant proportion of our taxes.

We feel it is entirely unreasonable to be committing such a high level of spending to planning for the new town, because the Local Plan has yet to be approved by the Inspector.

There is significant opposition to the new town, and even Hart admits the new town is not necessary to meet even their own inflated housing targets.

Why a new settlement debunked predetermination

SInce then the ONS have released new figures for household growth that are even lower. These new figures mean we have enough housing supply already to meet our needs out to 2041 and beyond without the new town.

In addition, we will soon reveal documents that show regeneration of Fleet is a viable and attractive alternative, that won’t need any council taxpayer funds.

 

 

Hart Council auditions for La La Land

Hart Council has made a quite extraordinary response to a question about the housing projections used in the Local Plan. This was made in answer to a question put to the Council Meeting held on 29 September 2018.

The council has contradicted its own chosen method for calculating housing need that was used in the submission version of the Local Plan. It has also contradicted its own Topic Paper on housing numbers published as recently as August 2018. It is suggesting we will be examined on the old ‘SHMA method’, rather than the new standard method for calculating housing need set out by the Government. Yet, Hart Council used the standard method to prepare the Local Plan and in its recent Topic Paper on housing numbers. It beggars belief that Hart Council doesn’t have a consistent position on such a key issue.

However, regardless of the method used to calculate housing need, the Winchfield New Town is not required.

Here is the question, the council’s answer and our response.

Question to Hart Council

For the first time, on 20 September, the Office for National Statistics produced household projections for England, a report previously compiled by the Ministry of Housing, Communities and Local Government. These latest projections supersede the 2014-based household projections. The projected percentage change in the number of households for Hart, from 2016 to 2041 is 12.4%, a change of 4615 households. What impact will this projection have on the Local Plan at the Examination in November?

Hart Council Answer

Apologies for the style of English, but this is verbatim from the minutes.

The simple answer is it will have no effect at all for two separate reasons: Firstly, under the new NPPF transitional arrangements (para 214) we are primarily being examined under the old NPPF 2012 rules which in effect means that we are being examined under the 2016 Hart/Rushmoor/Surrey Heath SHMA (Strategic Housing Market Area Assessment) and not the Government’s new standard methodology. Taking the SHMA into account the new 2016 population figures, when considering employment uplifts (as recognised in the recent Rushmoor Local Plan examination) our objectively assessed housing need of 388 dwellings/annum is not materially changed.

Secondly, whilst we will be arguing that the Government’s new standard methodology is a material consideration, as everyone knows the Government has decided not at this time that it is not [we don’t know if this is an intentional double negative either -ed] to be used for Local Plan purposes. That is because the Government has realised that it does not significantly boost the supply of new homes as sought by para 59 of the new NPPF.

In the housing white paper the government was clear that reforms set out (which included the introduction of a standard method for assessing housing need) should lead to more homes being built. As the Government itself now realises, the revised 2016 projections are likely to result in the minimum need numbers generated by the method being subject to a significant reduction. That was not the Government’s intention.

In order to ensure that the outputs associated with the method are consistent with this, the Government is now considering adjusting the method so that it’s use is consistent in aggregate with the proposals in Planning for the right homes in the right places consultation and continues to be consistent with ensuring that 300,000 homes are built per year by the mid-2020s.

That means that any housing numbers generated by the use of the standard methodology must go up and given the implications of the reliance on the 2016 population projections the numbers must go up significantly. That’s is exactly why the Council has been prudent in building in a 30% buffer in its housing needs targets to give itself some insurance against these unforeseen changes.

Our response to Hart Council

First, it is wrong to say “we are primarily being examined under the old NPPF 2012 rules”.  This is borne out by the Inspector’s own assessment of the key issues.

Hart Local Plan Examination Matter 3 - Housing Need and Requirement

Hart Local Plan Examination Matter 3 – Housing Need and Requirement

This clearly states that one of the key issues is to decide the basis on which the Local Plan will be examined. That question has not yet been decided by the Inspector. Moreover, the Inspector is going to challenge the uplift the Council has made to the standard method.

Indeed, Hart decided to use the standard method to create the Local Plan in the first place. Notably, the council has also doubled down on this stance in its recent Topic Paper on Housing Numbers.

Hart Council Housing Numbers Topic Paper - Choosing the standard method

Hart Council Housing Numbers Topic Paper – Choosing the standard method

Hart Council has explicitly ruled out using the old SHMA method of calculating housing need after taking advice from experts IPe Intelligent Plans and Examinations. It is quite astonishing that the Council should effectively contradict itself on such an important matter.

It is worth making two additional points:

  1. The SHMA itself can be subject to challenge, not least because it makes a number of spurious assumptions to justify increasing the ‘need’ above the raw population increase.
  2.  The SHMA numbers are very similar (382 dwellings per annum) to the figures in the Local Plan. These numbers would fall slightly if the starting point was updated to take account of the new ONS household projections. The Winchfield new town would still not be required even if the Inspector decide to use the SHMA figures.

Councillors suffer Gurkha Square derangement syndrome

Fleet councillors suffer Gurkha Square derangement syndrome

Fleet councillors suffer Gurkha Square derangement syndrome

The chairman of Fleet Town council has claimed there is a silent majority who support his plans to develop Gurkha Square. His words come despite the Fleet Parish poll that gave an emphatic thumbs down to the plans to build a new centre on Gurkha Square.

We think this is delusional and anti-democratic. It seems a number of elected politicians seem to succumb to derangement syndrome when votes don’t go the way they want.

Fleet Town Council are running a separate consultation about the development. Those who wish to express a view can find details here.

Voting closes on 5 October.

He even had a slide that described the Fleet Parish poll vote as overwhelming.

Fleet parish poll overwhelming against development on Gurkha Square

Fleet parish poll vote overwhelming

For the record, the Parish poll results were:

  • 952 votes were counted
  • 753 opposing the scheme
  • 199 in favour
  • There were two spoiled ballots

In better news, Hart Councillor for Fleet, Steve Forster has called for Hart and Fleet Town Council to work together to come up with a new proposal to improve the community facilities in Fleet. We agree with this approach and would strongly support measures to regenerate Fleet. The starting point ought to be a project to redevelop the whole Civic Quarter and improve the Hart Shopping Centre.

 

 

Winchfield New Town torpedoed by Government figures

Winchfield New Town torpedoed by new Government figures

Winchfield New Town torpedoed by new Government figures

The Government have published new figures that further undermine Hart’s proposals for the Winchfield New Town in the Hart Local Plan.

The housing requirements for Hart, Rushmoor and Surrey Heath have been significantly reduced. Rushmoor is already planning for far more houses than it needs. Surrey Heath now has more housing supply than it will need to deliver to meet these new targets.

The impact on Hart is that we already have enough housing supply in the Local Plan to meet our needs up to and beyond 2041. This means that the proposed Winchfield New Town is not required at all. We believe it’s time to ditch the new town idea from the Local Plan. Failure to do so might result in the Local Plan being found unsound at examination.

New household projections impact on housing need

The Office for National Statistics has published household projections based upon a 2016 baseline. These new figures update earlier projections based on a 2014 baseline. The projections for Hart are lower than prior estimates and should reduce the number of houses we have to build.

We are concerned the current Lib Dem/CCH coalition won’t take advantage of this opportunity to ditch their ridiculous Winchfield New Town Plan.

The new projections show the number of households in Hart rising from 37,129 in 2016 to 40,347 in 2032. The total rises to 41,744 in 2041. This works out at a rate of 201 dwellings per annum (dpa) from 2016 to 2032 and 185 dpa from 2016 to 2041.

Hart District household changes based on 2016 baseline show no need for Winchfield New Town

Hart District household changes based on 2016 baseline

The new Government methodology for calculating housing need adds an ‘affordability uplift’ to these baseline figures. In Hart’s case, this is the maximum of 40%. Adding this uplift takes our total housing need t0 4,505 upto 2032 and 6,461 up to 2041. The required build rate is 282 dpa in the period 2016-2032 and 258 dpa from 2016-2041.

Comparison to the Hart Local Plan

The Government baseline used in the Local Plan was 292 dpa using the 2014-based figures. Hart has uplifted this requirement up to 388 dpa in their Local Plan, giving a total planned build of 6,208 houses.

Hart Local Plan 2016-2032 justification

Hart Local Plan 2016-2032 housing numbers justification

Their justification of contingency against uplift doesn’t hold water as we only need to build a total of 6,461 up to 2041.

At the time the Local Plan was prepared, they had already conservatively estimated 6,346 of available supply.

Understated housing supply

Since then, they have produced a topic paper as part of the Local Plan examination process that shows housing supply of 6,401. This is just 60 short of what is actually required up to 2041. The outstanding 60 will be more than met by the 72 dwellings expected to be built at Hartland Village in 2033 (see housing trajectory here, p24).

Hart District Housing Supply April 2018 demonstrates no need for Winchfield New Town

Hart District Housing Supply April 2018

Impact on Rushmoor and Surrey Heath

The housing requirements for both Rushmoor and Surrey Heath have come down considerably. There is definitely no need to plan for any overspill from either borough.

Indeed, Rushmoor is already planning for far more houses than they actually need. Surrey Heath’s supply now exceeds their requirement.

One could argue that if future projections were to increase, Rushmoor could easily absorb this.

Impact on Winchfield New Town proposals

To sum up, the Local Plan already proposes to build more houses than we need in the period to 2032. Hart Council chose to add a Winchfield new town on top of that inflated requirement. They intend to deliver even more unnecessary new houses from the mid-2020’s. These new Government figures show we already have more than enough housing supply to meet our actual needs up to and beyond 2041, without a new town.

It simply is not credible to keep the Winchfield New Town in the plan. Time to ditch it.

 

 

 

 

Fleet Parish Poll to Save Gurkha Square

Fleet Parish Poll to Save Gurkha Square

Fleet Parish Poll to Save Gurkha Square

Fleet Town Council (FTC) have reluctantly agreed to hold a Fleet Parish Poll to decide whether the new Harlington should be built on Gurkha Square.

We urge eligible voters to vote “No” to the question:

“Do you support the Fleet Town Council proposal to build a new Harlington complex on Gurkha Square?”

Our reasons are:

  • The costs are astronomical. The latest costs are estimated at over £11m, that will be paid back by Fleet residents for 45 years. Longer, if as is usual with projects like this and the costs overrun. We don’t think the finances add up, as described here.
  • Hart residents will lose valuable parking revenue from the existing car park. No alternative car parking arrangements have been agreed.
  • We don’t yet know what assets FTC will have to hand over to recompense Hart for loss of the car park.
  • There are better ways of spending taxpayers money to kick-start the regeneration of Fleet.
  • We also don’t like that fact that Hart residents are not being asked if they would like to give up the Gurkha Square asset, and don’t know what assets they will receive in return.

Fleet residents can vote between the hours of 16:00 to 21:00 on Thursday 13th September at the following polling stations:

  • Ancells Farm Community Center, 1 Falkners Close, Ancells Farm.
  • Church Crookham Baptist Church, 64 Basingbourne Road, Fleet
  • The Harlington Polling Station, Fleet Road
  • St. Philip & St. James Church Hall, Kings Road, Fleet
  • The Lismoyne Hotel, 45 Church Road, Fleet
  • Hart Leisure Centre, Emerald Avenue (off Hitches Lane).

Polling cards are not required.

Fleet Parish Poll resources

A helpful website about the Fleet Parish Poll has been created by concerned residents, and can be found here.

There’s also a leaflet about the  Fleet Parish Poll that can be downloaded below.

Save Gurkha Square in the Fleet Parish Poll
Save Gurkha Square in the Fleet Parish Poll

Please help us to save Gurkha Square.

 

 

 

Developers launch Owens Farm appeal

Developers launch Owens Farm Appeal at Hook, Hart District, Hampshire

Developers launch Owens Farm appeal

We are sad to report that Wilbur Developments have launched an appeal against Hart’s decision to refuse permission to build on Owens Farm, Hook.

Hart announced their decision on 20 June. The decision to refuse planning permission can be found here.

The main reasons given were:

  • Outside Hook settlement boundary
  • Lack of sustainable transport options for the high number of extra cars
  • Within 7km of the Thames Valley Heath SPA
  • No legally binding obligation to provide affordable housing

The developer’s appeal case can be found here, or by searching on Hart’s public access site for reference 17/02317/OUT. The planning inspectorate number is APP/N1730/W/18/3206951 and can be found here.

Owens Farm Appeal APP/N1730/W/18/3206951

Owens Farm Appeal APP/N1730/W/18/3206951

The main arguments in their appeal are:

  • Planning policies out of date
  • They have put forward sustainable transport solutions to upgrade footpaths, cycle-paths and contirbute to the the bus service between Hook, the site and Basingstoke
  • Provision of SANG

Statements have to be made to the Inspector by 11 September 2018.

Impact of Owens Farm Appeal

Given that the date for submissions fals well after the submission deadline for the Pale Lane (Elvetham Chase) appeal, we strongly suspect the Owens Farm Appeal hearing will be well after the Pale Lane Appeal hearing of 8 January 2019. Both dates are after the anticipated examination of the Hart Local Plan.

We therefore hope the Local Plan can be made sound (with the removal of Winchfield new town) and the Owens Farm appeal will be refused.

 

 

 

 

Hart Local Plan Examination Update

Hart Local Plan Examination

Hart Local Plan Examination Update

It looks like quite a lot has been going on in relation to the Hart Local Plan examination. We have updates on:

  • Timing of the Hart Local Plan examination hearings
  • Early stage procedures for the Hart Local Plan examination
  • National Planning Policy Framework (NPPF) applying to the examination
  • Impact on Pale Lane (aka Elvetham Chase) appeal

Timing of the Hart Local Plan Examination hearings

Back in June, Hart Council briefed the Parish Councils about the Hart Local Plan examination. The full briefing can be found on the download below. They set the expectation that the Local Plan examination would start in late September and last 2-3 weeks.

Hart Local Plan Examination Briefing 12 June 2018 - Hearing Sessions

Hart Local Plan Examination Briefing 12 June 2018 – Hearing Sessions

We have been in touch with the Programme Officer, a man called Ian Kemp, who can be contacted here. He tells us that he has:

Provisionally scheduled hearings during the weeks of 19/11 and 3/12.

So, the examination is going to be 2 months later than Hart’s estimate.

Early stage procedures for the Hart Local Plan examination

In the June briefing Hart said that the Planning Inspector would issue a note in mid-July explaining the role of the Programme Officer and the status of any modifications to the Local Plan. This note was also to cover the timetable for submitting additional material and how the hearing sessions would work.

Hart Local Plan Examination Briefing 12 June 2018 - Timetable

Hart Local Plan Examination Briefing 12 June 2018 – Timetable

Ian Kemp tells us that he is:

Required to contact all representors six weeks prior to the start of the Examination to relay the details and arrangements. For the moment, the Inspector is in the early stages of his preparation.

So, it looks like we won’t know more details about how the Examination will be conducted around the beginning of October.

NPPF Framework applying to the Hart Local Plan examination

The revised National Planning Policy Framework has been released recently. Fortunately, it contains clause 214 that says:

Policies in the previous Framework will apply for the purpose of examining plans, where those plans are submitted on or before 24 January 2019.

This means that the Hart Local plan will be examined under the old framework. This might be mixed news. On the plus side, they won’t be examined on policies they didn’t know about when they were preparing the plan. On the negative side, it may well mean that the housing numbers that will apply to the examination will be those in the SHMA (8,022 or 382 dwellings per annum or so over the period 2011-2032), rather than the new figures in the Government consultation.

As a reminder, the Government figures were for 292 dpa, which results in a total of 4,672 over the shorter planning period of 2016-2032. However, Hart decided to increase this to 388dpa over the same period. We suspect the housing numbers will become a big debating point in the examination.

Impact on Pale Lane (Elvetham Chase) Appeal

The Pale Lane (Elvetham Chase) appeal hearing has been scheduled to being on 8 January 2019. This date in contained in a new schedule published on the planning inspectorate website, that can also be found here.

Pale Lane Appeal details APP/N1730/W/18/3204011

Pale Lane Appeal details APP/N1730/W/18/3204011

On the face of it, this looks like good news as it seems most likely to us that the appeal will not be upheld. Assuming the Local Plan is found to be sound in December 2018, and Pale Lane is not on the list of approved sites, then we cannot see how the inspector can uphold the appeal. However, if the Hart Local Plan examination finds the plan unsound, then Pale Lane may go ahead.

 

Hart Local Plan Submission Briefing
Hart Local Plan Submission Briefing