CCH doubles down on Winchfield new town bias

CCH doubles down on Winchfield new town bias

Community Campaign Completely Concrete Hart CCH doubles down on Winchfield new town bias

In a quite astonishing development, Community Campaign Completely Concrete Hart CCH have doubled down on their Winchfield new town bias.

In an update to their website since last night, they have added the following paragraph:

The pressure for new development never goes away and a new settlement is the most effective way to absorb these central government imposed demands while delivering much needed infrastructure. If we don’t start the process of planning for this now we will forever face the blight of urban extensions over and over again.

Community Campaign Completely Concrete Hart CCH Doubles down on Winchfield new town bias

CCH doubles down on Winchfield new town bias

This comes despite the Inspector saying:

I am of the view that a significant level of further supporting work would be required for Policy SS3 to be found sound in its current form, which would need to include appropriate and proportionate area/site assessments, infrastructure considerations, viability testing, evidence in support of deliverability and further SA work, which would need to be done in an impartial manner with sufficient evidence to support its findings and comparisons with alternative options.

Of course, the Inspector said that their infrastructure plans lacked substance. So, they couldn’t even demonstrate the benefits of their main reason for supporting a new town.

The work simply hasn’t been done to demonstrate that a new town at Winchfield is the most effective way of delivering additional housing growth or infrastructure beyond the plan period. Moreover, the Inspector says that even the additional work might not show the new town being found sound:

I am also mindful that following further work, there can be no guarantee that the evidence would support it as the most appropriate long-term growth strategy or that Policy SS3 would be found sound.

We simply cannot trust CCH to be impartial on the matter if and when the additional work is carried out.

Alternatives to a new town

There is an alternative to both a new town and urban extensions. That is urban regeneration.

The Local Plan acknowledges that a big problem facing Hart is that it has not kept up with its neighbouring districts. Hart’s shops, restaurants and leisure services are losing out to the competition. This is openly acknowledged in the Local Plan:

  • The outflow of retail expenditure from the District…is relatively high and is likely to remain high in the future”: Local Plan para 65.

The main cause is that no effort has been made to invest in the re-generation of Fleet (where 40% of Hart’s population lives) or Blackwater, Hook or Yateley. This is also openly acknowledged in the Plan:

  • The main centres in Hart have not kept pace with other centres in the wider area. Other centres have strengthened and improved their offering through investment and development. Failure to invest in the centres will see them continue to fall in the rankings”. Retail, Leisure and Town Centre Study Part 1 para 2.15
  • The challenge for Fleet specifically will be to secure investment so that it can compete with the comparable towns in neighbouring districts. All the neighbouring towns are subject to regeneration or expansion projects”. Local Plan Para 66

It is to be welcomed that Hart Council are removing the new town from the Local Plan. Any plan for the future must include the option of regenerating our urban centres. This needs to be properly and impartially evaluated.

Local Plan Examination: Heads Must Roll!

As regular readers will recall, the Council announced the preliminary results of the Hart Local Plan Examination a couple of days ago. We have now had time to read the detailed letter from the Inspector and form some conclusions.

The purpose of this post is to summarise the Inspector’s preliminary findings and suggest our own next steps for the Local Plan. In short, the Inspector’s report is damning and heads must roll.

Summary of Local Plan Examination Preliminary findings

First, the Council’s characterisation of “a couple of issues in relation to the Local Plan” understates the ferocity of the Inspector’s criticisms by quite some margin. The Inspector’s full report can be found here.

His criticisms of Policy SS3 and the area of search for the new settlement are deep and comprehensive. He says:

I have a number of fundamental concerns with regard to the soundness of Policy SS3.

He lays out concerns about infrastructure, saying the plans lack substance. He also points out there’s a large tract of land in the middle of the Area of Search is not and will not be available. But he reserves his most scathing attack for the Sustainability Appraisal (SA). Even though there were concerns raised about the legal compliance of the document, these don’t matter, because the document itself was so bad.

Far from being a “couple of issues”, these criticisms explode a cruise missile right at the heart of the Council’s flagship policy.

The criticism of the SA is damning. Hart submitted two sustainability appraisals, one before submission and one after.  Of the first, the Inspector says:

I am not of the view that the pre-submission SA, in its own right, appropriately or robustly considers reasonable alternatives to a new settlement as a long-term growth strategy

The second SA did test reasonable alternatives, but inappropriately. The Inspector cites several examples:

  • The ranking of Option 1b (the new settlement) “as the best performing under heritage is not justified”.
  • For land and other resources, the ranking of Option 1b “is also therefore not, in my view, robust”.
  • The Inspector decided that “the decision not to rank the options in terms of flood risk to be very questionable”.
  • On landscape issues the Inspector concluded:

Option 1b was ranked joint highest with Option 1a. However, it is unclear why this is the case, given that the proposed new settlement would result in the development of large areas of open countryside and Option 1a already benefits from planning permission and is largely previously developed land. Further, the post submission SA notes that Pale Lane is ‘relatively unconstrained’, but despite this and it being a smaller site / potential development, Option 3a is ranked lower than Option 1b.

  • The Inspector has this to say on the climate change ranking:

Option 1b has been ranked the highest under the category climate change. This is as a result of the potential for the proposed new settlement to deliver a district heating system. However, there is little evidence to suggest that this is a feasible or realistic option that is being actively pursued by the site promoters. I consider this raises doubt about the appropriateness of such a ranking.

  • The ranking for the impact on water was also criticised by the Inspector.
  • In conclusion on the SA the Inspector said:

In my judgement the scoring of Option 1b above or equal to other options is not justified by the evidence. As a result, I consider that Policy SS3 and its supporting text are not justified, as, on the currently available evidence, it cannot be determined that it represents the most appropriate long-term growth strategy.

I consider that the post submission SA is therefore not robust and should not be relied upon in support of the Plan.

In addition, the Inspector clearly states:

Given my earlier findings in terms of the housing requirement, Policy SS3 is not required for the Plan to be sound and, in light of my comments above, I consider that the most appropriate course of action would be to remove it (along with any other necessary subsequent changes) from the Plan through Main Modifications (MMs). This would allow the Plan to progress towards adoption without any significant delay to the examination process.

Substantially all of these points were made by We Heart Hart and Winchfield Parish Council during the consultation process. So, all the issues were known to Hart Council before submitting the plan for examination, yet they chose to press on with the doomed policy. In effect, the Council has been caught red-handed trying to gerrymander the SA in what looks to us like a clear case of policy-based evidence making.

It is true that the Inspector has left open the door for the new town to return in future. But this is conditional upon the new town being considered properly alongside all other options for long term growth beyond 2032.

I consider that it would not be unsound for the Plan to retain the Council’s aspirations to plan for long-term needs beyond the Plan period, which could include the delivery of a new settlement. But, the Plan should clearly state that this, as a growth option, would need to be fully considered and evidenced in a future (potentially early or immediate) review of the Plan or a subsequent DPD.

I am of the view that a significant level of further supporting work would be required for Policy SS3 to be found sound in its current form, which would need to include appropriate and proportionate area/site assessments, infrastructure considerations, viability testing, evidence in support of deliverability and further SA work, which would need to be done in an impartial manner with sufficient evidence to support its findings and comparisons with alternative options.

[Update 5/3/2018] But there is a significant caveat from the Inspector:

I am also mindful that following further work, there can be no guarantee that the evidence would support it as the most appropriate long-term growth strategy or that Policy SS3 would be found sound.

[/Update]

Budget Impact of New Town Planning

In addition to the hundreds of thousands (if not millions) of pounds already spent, we should also note that in the same Council meeting, they agreed to spend £785,990 on the new settlement in the next financial year (Paper B Appendix 3). Residents might reflect on the other important services that might be delivered with this money, like free-parking in Fleet to boost retail footfall.

Hart Council 2019-20 budget for new settlement

Hart Council 2019-20 budget for new settlement

In summary, we have a Council that has botched its flagship policy, had it found unsound but is proposing to squander even more of our hard-earned council tax on the same failed policy.

Next Steps after the Local Plan Examination

The first and most obvious point is that we need to get the Local Plan over the line as soon as possible. This means that the Council should abandon Policy SS3 immediately and agree to take Surrey Heath’s unmet need. They should reply to the Inspector forthwith, agreeing to his demands and get on with changing the plan to make it sound.

This is necessary to protect Pale Lane and Owens Farm in Hook and any other planning appeals that might come along.

Before any further review of the plan to identify and evaluate properly the options for long term growth beyond the plan period, root and branch reform is required.

Root and Branch Reform – Heads Must Roll

Let’s take a look at what is required. First, let’s look at the members.

Liberal Democrats

Hart Local Plan Examination: Liberal Democrats David Dave Neighbour in the pocket of CCH James Radley

Liberal Democrats in the pocket of CCH

The Portfolio Head for Planning, Graham Cockarill and the Council Leader, David Neighbour have allowed themselves to be the puppets of Community Campaign Completely Concrete Hart (CCH). They have preened themselves in positions of power whilst presiding over the car-crash that is Policy SS3. They have wasted hundreds of thousands of pounds, wasted precious time and put at risk more of our green fields. Trying to position the Inspector’s report as a success with only a couple of minor issues to resolve, simply will not wash.

They have lost all credibility and authority and should immediately resign their Cabinet positions and consider whether they should continue in their role as Councillors. Hopefully, their Yateley electors will see through their ineptitude and bring down the guillotine on their political careers.

Community Campaign Hart

Community Campaign Completely Concrete Hart screwing up Hart Planning since 2004

Completely Concrete Hart screwing up Hart Planning since 2004

Then we have the puppeteers in CCH. The main protagonists are James Radley and Alan Oliver. Their track record is woeful. The then ruling Conservatives (who are far from blameless in this affair) had a draft Local Plan, without the new town, in late-2016. CCH scuppered that plan by insisting that a new option to include the new town be included. This was even though surprise, surprise, Winchfield had failed testing due to concerns about flooding and lack of infrastructure. This delayed the Local Plan, put Pale Lane and Bramshill at risk and wasted even more money.

They persisted with the lost cause appeal against Grove Farm/Netherhouse Copse, wasting probably over £100,000. Our questions to Council have been censored because they found them uncomfortable (see here and here). They have dismissed We Heart Hart’s concerns, that have now been proven to be right, as “Trump-like diatribes”, “misinformation and outright lies”. They said in Fleet News that they would deliver an “infrastructure-led” Local Plan, yet the plan contains only threadbare infrastructure proposals, with big gaps in costing and funding. Moreover, the Inspector has dismissed the new town partly on the grounds that infrastructure plans lacked substance.

CCH have obstructed brownfield development and won’t even consider urban regeneration seriously. Their pig-headed delusion has resulted in the new town plans being shredded in public by the Inspector. CCH have been revealed as an empty vessel that makes a lot of noise but has no substance. They should immediately resign their Cabinet positions and consider their positions as Councillors. Even Church Crookham electors might begin to recognise the pattern of failure and remove them at the ballot box.

Hart Council Officers

We cannot ignore the role of the officers in this fiasco. In 2012, they recognised that a new town at Winchfield would require new studies, more land, infrastructure assessment and testing. Seven years on, and all that work has either not been completed or failed. We should remember that their 2013 Local Plan failed at Inspection. They too have pursued inappropriate appeals that were doomed to failure. In 2015, they said that there was capacity for only 450 dwellings on brownfield land. Since then permission has been granted for thousands of homes at Hartland Park, Sun Park and many office conversions. Their estimate was out by a factor of at least 5.

They admitted at the Examination that they have been working with the developers on the new town plan for over four years. Now they have been caught out gerrymandering the SA. All this wasted time and money has resulted in their flagship policy ending in abject failure. One must question their judgement, independence and ability to offer sound advice to members and residents.

It is time for a complete replacement of the Planning Team, starting at the top with the joint-Chief Executive.

 

It is only after getting rid of the dysfunctional Cabinet and the failed Planning team that we can start to plan properly for the future beyond the plan period with fresh ideas.  This should include a proper assessment of the regeneration of our urban centres as a much more palatable option than unnecessarily concreting over more of our precious green fields.

Ding Dong! Winchfield new town is dead

[Update: Inspector’s Letter now published here. Analysis to follow at the weekend – now here]

Hart Council has received a letter from the Planning Inspector giving a provisional assessment of the Hart Local Plan. He has made two recommendations to make the plan sound.

  1. Remove Policy SS3, so we won’t be having a new town in Winchfield within the plan period, because the extra houses are not needed.
  2. We must take around 750 of Surrey Heath’s unmet need, which can be met with the current development plans.

The news was given at tonight’s council meeting by Graham Cockarill. This is obviously very good news for those of us who have been campaigning for this result for years. However, it is clear form Councillor Cockarill’s statement that there are still factions within the council that want to try and sneak the new town back in at a later point. Indeed the body language of the councillors is more of disappointment than jubilation that they are close to getting a sound Local Plan.

The full letter from the Inspector will be published here on Hart’s website tomorrow morning. We will provide updates once we have considered the detail.

A video of the councillor’s statement about the Hart Local Plan is shown below, together with our transcript of what he said (with our emphasis).

Impact of removing the Winchfield new town policy SS3 from the Hart Local Plan

It remains to be seen what the fallout might be form this news. First, the positives.

The Inspector’s view ought to scupper the Pale Lane/Elvetham Chase Appeal. It should also ensure the appeal for the land West of Hook around Owens Farm doesn’t succeed either.

Now on to the negative aspects. One has to think that this whole process would have gone much quicker and cost much less money if the Council had abandoned the unsound idea of the new town much earlier. I am sure that We Heart Hart will not be the only people holding our councillors and officers to account for this waste of our time and money.

Graham Cockarill Announcement about Hart Local Plan 28 February 2019

I have received a message a couple of days ago from the Inspector Jonathan Manning giving us provisional feedback on a couple of issues associated with the Local Plan. I must stress that this is not his final report, but it gives us a clear indication that subject to the council agreeing a couple of important modifications, we are close to having in place a sound Local Plan.

It is a very important milestone because we have never reached this stage before.

The Inspector has accepted our assessment of what is our Objectively Assessed Housing Need of around 388 dwellings per annum. And recognised our positive approach to meeting that need. It is for this reason that the Inspector recommends that we agree to meet Surrey Heath’s unmet need because he considers that it can be done within our projected targets without changing our plan or having to find other sites.

The Inspector’s other key recommendation is that we do not at this time pursue policy SS3. In his view, the new settlement approach is not sufficiently developed to be included in the plan, particularly as the numbers of new homes it may deliver are not necessary to meet the housing numbers within this plan [period].

The important point here is that the Inspector does not rule out a new settlement option in the future. He recognises our clear aspiration to deliver a settlement to meet our long-term housing needs. He accepts that it would be acceptable for the Plan to retain the Council’s aspirations to plan for long term needs beyond the plan period which could refer to the delivery of a new settlement through potentially either an early or immediate review of the Plan or a subsequent Development Plan Document (DPD).

He says that this would not change any timescales.

I intend later tonight, indeed before the end of this meeting, to circulate the Inspector’s letter and it will be published on our web page in the morning. I also intend to work with the respective group leaders and through the Local Plan Steering Group to agree the next steps. But it would seem to me that our best interests lie in getting a sound Local Plan swiftly in place in the form recommended by the Inspector.

This is great news for both the Council and its residents, because having a Local Plan in place gives us a sound basis to make future planning decisions and removes the threat of planning by appeal.

Question: Can you make sure all councillors get a summary of the Bramshill result once it has been studied?

Answer: Yes. An email has been sent by the joint-CEO a couple of weeks ago. I will ask for a more concise version to be circulated.

Question: Could you confirm the number of houses from Surrey Heath that will be accepted.

Answer: [Uncertain], but around 750 over the plan period.

 

Hart Planning Update

 

Keep Calm and Wait for news about the Hart Local Plan

Hart planning update early 2019

Belated Happy New Year and welcome to our Hart planning update. We haven’t published much recently, because there hasn’t been much to say. However, a few people have been in touch to ask how things are going. So, welcome to the New Year and to our update on the major planning issues affecting Hart.

Hart Planning Update: Local Plan

[Update 28 Feb 2019: Plan will be sound if Policy SS3 is removed and Hart takes ~750 of Surrey Heath’s unmet need]

First up is the Hart Local Plan. The examination took place in November and December last year. We Heart Hart participated in the discussion about Infrastructure on 5 December. We understand that the Inspector is due to deliver his opinion in early to mid-February. Until then, we can only speculate on the outcome.

The Inspector can decide one of three outcomes:

  • the submitted Plan is found sound
  • Local Plan is not sound but could be made sound by making modifications
  • the Local Plan is not sound and could not be made sound

The second outcome is the one we hope for. It is to be hoped Policy SS3 related to the Winchfield new town is removed as the main modification.

We understand that during the examination the Inspector asked for changes to the policies related to Local Gaps and SANG. However, he remained inscrutable on the other key issues which we believe are the:

  • Housing numbers
  • New settlement
  • Sustainability Appraisal (SA)

Given the reports we have received about some of the key discussions, we believe Hart is vulnerable on the new settlement and the sustainability appraisal. Hart attempted to present evidence about the new settlement that had been submitted after the deadline. This evidence was rejected. Strong arguments were presented on both sides of the argument. However, we believe a key exchange was when the Inspector got Hart (and we believe the developers) to agree that he could not approve the new settlement unless he found that it was deliverable.

We also understand the SA came in for sustained criticism.

We have to await the Inspector’s judgement. If major changes are required, then there may well be political implications at the council.

Hart Planning Update: Elvetham Chase/Pale Lane Appeal

The Elvetham Chase (aka Pale Lane) appeal took place earlier this month. We understand one of the council’s arguments was that the extra 700 houses were not required were not needed to meet the housing targets in the Local Plan. This is somewhat ironic as the Winchfield New Town is also not required to meet the targets. The proposed site for the new town is only a couple of hundred metres from the Pale Lane site. Yet the council is supporting the new town and opposing Pale Lane.

Of course, we hope the Pale Lane appeal fails.

We understand that the appeal hearing was adjourned, pending the results of the Local Plan examination. Apparently, both Wates and Hart Council will then be given a short period to  respond to the Pale Lane Planning Inspector.  The inspector will then make his recommendation to the Secretary of State who will decide whether to uphold or dismiss the appeal.

Quite a lot will rest on how much weight is given to the Local Plan by the Pale Lane inspector. We understand uncontentious elements will carry significant weight. Contested elements will carry no weight. So, we have to hope that the Local Plan inspector accepts the housing targets presented in the Local Plan (or lower). If he does, we can see no reason why Pale Lane should go ahead. However, if the Inspector accepts Hart’s own argument in the Local Plan that they need to plan for more houses than required, the appeal may succeed.

Hart Planning Update: Bramshill Appeal

We haven’t heard much about this, but believe some appeal hearings have been held. We have no further information on the timing of any decision.

Hart Planning Update: West of Hook Appeal

We understand the appeal will start on 19 March 2019 and will sit for up to 8 days.  More details can be found here.

Again, we hope this appeal fails. However, quite a lot depends upon the results of the Local Plan examination and the weight placed upon it at that time.

 

We will keep you up to date as more information emerges.

 

Developers launch Owens Farm appeal

Developers launch Owens Farm Appeal at Hook, Hart District, Hampshire

Developers launch Owens Farm appeal

We are sad to report that Wilbur Developments have launched an appeal against Hart’s decision to refuse permission to build on Owens Farm, Hook.

Hart announced their decision on 20 June. The decision to refuse planning permission can be found here.

The main reasons given were:

  • Outside Hook settlement boundary
  • Lack of sustainable transport options for the high number of extra cars
  • Within 7km of the Thames Valley Heath SPA
  • No legally binding obligation to provide affordable housing

The developer’s appeal case can be found here, or by searching on Hart’s public access site for reference 17/02317/OUT. The planning inspectorate number is APP/N1730/W/18/3206951 and can be found here.

Owens Farm Appeal APP/N1730/W/18/3206951

Owens Farm Appeal APP/N1730/W/18/3206951

The main arguments in their appeal are:

  • Planning policies out of date
  • They have put forward sustainable transport solutions to upgrade footpaths, cycle-paths and contirbute to the the bus service between Hook, the site and Basingstoke
  • Provision of SANG

Statements have to be made to the Inspector by 11 September 2018.

Impact of Owens Farm Appeal

Given that the date for submissions fals well after the submission deadline for the Pale Lane (Elvetham Chase) appeal, we strongly suspect the Owens Farm Appeal hearing will be well after the Pale Lane Appeal hearing of 8 January 2019. Both dates are after the anticipated examination of the Hart Local Plan.

We therefore hope the Local Plan can be made sound (with the removal of Winchfield new town) and the Owens Farm appeal will be refused.

 

 

 

 

Stop Elvetham Chase hypocrisy (and CCH)

Stop Elvetham Chase Hypocrisy

Stop Elvetham Chase Hypocrisy

We have done some more digging to expose the Stop Elvetham Chase hypocrisy, after our article revealing that a leading member of was standing for election for Community Campaign Completely Concrete Hart.

To recap, Stop Elvetham Chase have consistently argued against development of Pale Lane. This is a position we agree with. However, they now support the unnecessary new town in Winchfield that is being proposed as part of the Hart Local Plan.

They have come up with 13 reasons to object to Elvetham Chase, many of which also apply to Winchfield. These reasons are reproduced below with our comments in red.

Stop Elvetham Chase Hypocrisy – their reasons apply to Winchfield too

1. The effect on the area – The valley of the River Hart is a naturally beautiful area. There will be a loss of hedges, trees and fields. It will destroy the semi-rural character of the approach to Winchfield, Fleet and Hartley Wintney. The area around the development is a haven for wildlife the developer’s proposal does not address this issue. When the green fields are gone they are gone for good! Quite. All these arguments apply even more to Winchfield.

2. The existing road design through Elvetham Heath is designed with no stopping areas, traffic islands and central islands to slow traffic through this residential estate. The use of these roads to take more traffic to the M3 and A30 will have a huge safety impact for pedestrians, cyclists, children walking to school and a significant increase on noise and pollution for the residents of Elvetham Heath. No doubt a new development at Winchfield will also affect traffic levels through Elvetham Heath. Not only that the roads through Winchfield are even narrower than the one through Elvetham Heath and not suited to 5,000 more houses.

3. The existing lanes surrounding Winchfield and Dogmersfield are narrow and windy with dangerous bends and bridges they are not designed to cope with the additional traffic any development the west side of Fleet would bring. Exactly.

4. Local secondary schools are at capacity. The houses planned or under construction at Brickyard, Pale lane and Grove farm (1700 homes in total) will be closer to Calthorpe than the children of Elvetham Heath. Calthorpe has no capacity to take any more children and as such it is proposed that children from Elvetham Heath and other perimeter areas of Fleet will be bussed to schools with capacity such as Yateley. It is possible that Elvetham Heath will be taken out of the catchment area for Calthorpe Park school totally. There is no evidence that we need a new secondary school. But, this argument applies equally to Winchfield, as they have yet to find a site for a school that is suitable. Even so, there’s no need to concrete over 100’s of acres of countryside to provide 10Ha for a new school.

5. Transporting children to schools miles away will have a detrimental environmental impact. It will also have a social impact on children, time spent travelling to school will reduce time for family activities, school clubs etc. It will also affect the health of our children, walking to and from school is a good form of physically activity. Not really an argument. Plenty of children travel a long way to school already.

6. Foot paths and road crossing points surrounding Elvetham Heath on roads such as Hitches Lane, Reading Road North and Elvetham Road are narrow and dangerous and congested to use at peak times such school start and finish times. Extra traffic will further compromise the safety of pedestrians and cyclists. Indeed, Basingstoke and Deane have opposed the new settlement on the grounds of too much extra traffic. These arguments apply equally to Winchfield.

7. There will be a significant increase in noise for existing houses along the perimeter of Fleet Road and the roads through Elvetham Heath. Existing gardens will be forced into red unacceptable levels. The new development will be sandwiched by a railway, the M3 and Fleet Road. Any new occupants will be surrounded by pollution and noise this has clear dangers to public health. The Environmental Health Department at Hart does not support the use of the Pale Lane site for residential development due to the very high levels of noise and constraint from the railway and the M3. Indeed a new settlement at Winchfield will detrimentally affect Elvetham Heath. In addition, the proposed area of search for the Winchfield new town is bisected by the M3 and the railway and bordered by the A30. Moreover, the Murrell Green portion is crossed by a Major Accident Hazard high pressure gas pipeline.

8. Local doctors surgeries are operating at capacity and have long waiting times for even routine appointments. Yes, and a new town won’t fix this either.

9. Pale Lane and the immediate area are liable to flooding. The proposal put forward by the developers makes little mention of the River Hart flood plane any development would contribute to the problem. Tell me about it. Winchfield East is very susceptible to flooding. It has flooded three time this year so far, and at least three times in 2016.

10. The development is against Hart’s policy to allow development of green field sites. There are enough Brownfield sites to meet demand. Hart has 6 years land supply exceeding the requirement for 5 years laid down by the Governments national policy Planning Framework. The land at Pale Lane and Grove Farm is not required to meet those obligations. Pale Lane is a green field site and it has not been previously identified for development. Indeed. We have been arguing this for more than three years now. This argument applies equally to Winchfield.

11. Car parking at railways stations of Winchfield and Fleet are at capacity. Trains are full and cannot cope with current demand. Indeed. 5,000 new houses at Winchfield will make this even worse, and no doubt impact Hook too.

12. The provision of a cycle path on the new development does not link to the existing cycle network and is of little purpose. No plans detailed enough for examination have been put forward for Winchfield.

13. There will be an impact on Fleet Pond with is a site of special scientific interest. There will be an increase of users (humans, dogs and vehicles). It is dubious whether Elvetham Chase will have any impact on Fleet Pond. Similarly, WInchfield. But whilst we are on the subject of SSSIs, why not consider Basingstoke Canal and Odiham Common which both border the proposed area of search for Winchfield?

As you can see, it seems their principles only extend as far as the railway line, and can’t be extended beyond their own narrow view. Stop Elvetham Chase hypocrisy. And now they are standing for CCH, stop Completely Concrete Hart hypocrisy too.

Cabinet Update: Pressure on to deliver the Hart Local Plan

Hart District Council seeks to block brownfield development

Hart District Council under pressure to deliver the Local Plan

Unfortunately, we could not make it to the Cabinet meeting on Thursday 5 April. However, we have received feedback from the meeting about the Hart Local Plan item.

Respondents to the Hart Local Plan Regulation 19 Consultation

We understand there were around 300 respondents to the consultation. However, there are about 1,500 individual representations. The council has its work cut out to analyse the representation and provide a response to each one.

Key themes

The key themes emerging from the consultation include a number of contradictory elements:

  • Inadequate infrastructure
  • Housing numbers too high
  • Housing numbers too low (from developers)
  • Housing numbers not robust
  • Quality of life issues
  • Reliance on strategic sites
  • Revisit reg 18 for sites
  • Should have more sites to spread the load
  • New gaps / more gaps
  • No gaps at all (from developers)
  • Employment sites/  brownfield sites
  • Regeneration of town centres, particularly Fleet
  • No minimum internal size (floor space) specified

In addition, there is a need to focus on sustainability and decide if the approach of adding a new settlement is sound. Apparently, Basingstoke and Deane objected to the new town on the grounds of the extra traffic it would generate. [Obviously we believe it is not sound, but that is for the Inspector to decide].

Timetable to submission of the Hart Local Plan

There was discussion of the work required before the Hart Local will be ready for submission. This includes:

Feedback from the Independent Planning Consultant (Keith Holland, a former Inspector) is expected by late April.

In addition a topic paper has to be produced to explain how the housing number was arrived at and other options if different numbers were used (i.e. plan ‘b’ and plan ‘c’).

Then  a further series of tasks are required:

  • Update project plan
  • Format each representation, enter onto database including HDC response
  • Update consultation statement
  • Identify issues arising from consultation
  • Make minor modifications to plan
  • Provide statements of common ground (highways, neighbouring councils etc.)
  • Review and update topic papers (including the new one on housing numbers)
  • Infrastructure plan review
  • Soundness check list
  • Review reg 18 and how consultation was responded to

There might be another meeting of the Local Plan Steering Group (LPSG) before submission.

The project team consists of one full-time leader and three part-time team members. However, the leader has been off sick recently. They want to get the plan submitted as soon as possible to help fight off two anticipated appeals. [We don’t know which ones exactly, but we would hazard a guess at Elvetham Chase (Pale Lane) and West of Hook].

They hope to achieve submission by mid-to-late May. [Our view is that this sounds ambitious given the level of work and the apparently sparse resources allocated].

Questions from the floor

Apparently, a number of questions were asked relating to:

  • Which housing numbers to use. Should these be based on the old SHMA or the newer Government methodology. It appears as though this hasn’t been decided yet. [We would prefer if the new Government methodology was used, as it gives a lower number. However, the inflated numbers the council have used in the Local Plan are slightly higher than the SHMA, once they are adjusted for the building between 2011 and 2016. So, either scenario does not require a new town].
  • Membership of the LPSG. Apparently, Conservative members won’t be invited to the LPSG unless their particular expertise is required.
  • Resourcing for the Local Plan. Apparently this is a very sensitive subject that resulted in some argument. [We take it that the officers feel under pressure to deliver quickly and are struggling for resource].

Let’s see what happens.

 

 

Hart Local Plan: Restore strategic gaps

Hart Regulation 18 Strategic gaps

Hart Local Plan Regulation 19 consultation removes the Regulation 18 Strategic Gaps

This is the sixth and final part of our submission to the Hart Local Plan Regulation 19 consultation. This article explains how Hart have removed the strategic gaps around Harley Wintney and Hook that were present in the last consultation. We believe they should restore them and policy NBe2 should be amended.  The process for making a submission is as follows:

  1. Go to the Hart Local Plan Regulation 19 Consultation page of the Council website
  2. From the Hart website, download and complete Response Form Part A (Personal Details). A copy can be downloaded here.
  3. Also download and complete the Response Form Part B (Your Representations), a separate Part B is required for each representation you wish to make. A copy can be downloaded here.
  4. Make sure you include words of this form in each representation. Policy [X] is not sound because it is not [positively prepared, justified, effective or consistent with national policy] (delete as appropriate).
  5. Once you have filled in Part A and Part B, please email them to [email protected] or post them to Planning Policy Team, Hart District Council, Harlington Way, Fleet, Hampshire, GU51 4AE.
Submissions have to be made before 4pm on 26 March 2018. If you are keen to get your submission completed, you can use the summary guide we have pulled together, or for the more adventurous, you can use our full submission. Please edit the text into your own words.

Restore the strategic gaps to the Hart Local Plan Regulation 19 Consultation

The Local Plan identifies strategic gaps between settlements.

Hart Local Plan Regulation 19: Hartley Winchook leads to no strategic gaps around Hartley Wintney nor to the east of Hook

Hart Local Plan Regulation 19 Consultation Strategic Gaps

However, no gaps are proposed to the east of Hook, to the north west of Fleet or anywhere around Hartley Wintney. This is contrary to the Regulation 18 consultation (see top), where strategic gaps were included to the east of Hook and the SW of Hartley Wintney. These should be restored and new ones added to give effective gaps between Winchfield and the west of Fleet/Elvetham Heath to avoid coalescence into a Hartley Winchook urban sprawl.

Remedy: This policy needs to be amended to include:

  1. A gap to the west of Hook from the east bank of the River Whitewater to at least the power line between Hook and Hartley Wintney
  2. A gap to the south and west of Hartley Wintney/Phoenix Green. This should be at both sides of the A30, from the existing end of development to the Murrell Green light-industrial estate and from St Mary’s Park to the motorway
  3. A gap from Elvetham Heath/A323 to the River Hart and from Edenbrook/Hitches Lane to the River Hart
  4. A gap from the east of Taplins Farm Lane/The Hurst to the River Hart.

 

Hart Local Plan: No plans for infrastructure

Hart Local Plan Regulation 19 consultation: no proper plans for infrastructure

Hart Local Plan Regulation 19 consultation: no proper plans for infrastructure

This is the fifth part of our submission to the Hart Local Plan Regulation 19 consultation. This article explains how Hart haven’t properly planned for infrastructure. In addition, the plans they do have will starve the places that really need it of investment. Policy I1 needs to be changed and policy SS3 needs to be removed. The process for making a submission is as follows:

  1. Go to the Hart Local Plan Regulation 19 Consultation page of the Council website
  2. From the Hart website, download and complete Response Form Part A (Personal Details). A copy can be downloaded here.
  3. Also download and complete the Response Form Part B (Your Representations), a separate Part B is required for each representation you wish to make. A copy can be downloaded here.
  4. Make sure you include words of this form in each representation. Policy [X] is not sound because it is not [positively prepared, justified, effective or consistent with national policy] (delete as appropriate).
  5. Once you have filled in Part A and Part B, please email them to [email protected] or post them to Planning Policy Team, Hart District Council, Harlington Way, Fleet, Hampshire, GU51 4AE. 
Submissions have to be made before 4pm on 26 March 2018. If you are keen to get your submission completed, you can use the summary guide we have pulled together, or for the more adventurous, you can use our full submission. Please edit the text into your own words.
WHH Local Plan Reg 19 Guide
WHH Local Plan Reg 19 Guide
WHH Local Plan Reg 19 Entry
WHH Local Plan Reg 19 Entry

How the Hart Local Plan Regulation 19 consultation needs to be changed to deal with infrastructure

One leading councillor has gone on the record, calling for an ‘infrastructure led’ Local Plan. Yet, they have not allowed questions to be put to them about infrastructure, let alone answer them.

Back in October 2014, Hart Council produced an infrastructure delivery schedule that set out the current deficit, split by type and area.  This shows a deficit of £78m not including healthcare facilities. The breakdown is shown by type and area in the images below:

Hart Local Plan Regulation 19 consultation: Hart District Estimated Infrastructure costs by type March 2013.

Hart District Estimated Infrastructure costs by type March 2013.

The breakdown of the costs by area showed the Fleet/Church Crookham and Hook areas had by far the largest deficits.

Hart Local Plan Regulation 19 consultation: Estimated Infrastructure costs by area March 2013

Hart District Estimated Infrastructure costs by area March 2013

Key quotes from the document include:

“It is therefore reasonable to conclude that it is unlikely that there will be sufficient future funds, from both capital programmes and developer contributions, within the plan period, to deliver all of the projects listed in the HCC Transport Statement”

“Although developer contributions will continue to play an important role in helping to bridge the funding gap, it is also clear that the funds raised through developer contributions will only contribute a modest proportion of the total identified funding gap”

 “The South West Main Line (SWML) outer trains, which serve Hart, has significant forecasted future peak crowding, with a capacity shortfall of over 6,100 passengers in the high-peak hour, even if every main line train is at maximum length”

It should be noted also that SWR has recently put forward proposals to reduce services at Winchfield and Hook, exacerbating the rail capacity problem. The Local Plan doesn’t even mention improvements to the rail network in infrastructure policies.

A more recent estimate from Hampshire County Council has estimated the infrastructure funding gap for Hart as £72m.

Hart Local Plan Regulation 19 consultation: Hart infrastructure funding gap £72m

Hart infrastructure funding gap £72m

Hart’s share of the gap is made up of:

  • Transport, £34m
  • Education: £38m.
  • Countryside: To be Determined.
  • Extra Care places: To be Determined.

No estimate has been made of the requirements or costs of additional healthcare provision.

The infrastructure policies in the Local Plan are insipid and fail to address the funding gap:

  • Policy I1: Infrastructure – weak policy simply requiring developers to deliver adequate infrastructure as part of their developments, when the studies above show that developer contributions won’t be adequate to bridge the gap
  • Policy I2: Green Infrastructure – feeble policy to supposedly protect green infrastructure. Yet they are proposing to build a new town that will destroy the best of our green infrastructure
  • Policy I3: Transport – inadequate policy simply to provide ‘maximum flexibility in the choice of travel modes’, nothing specific to improve road network or put pressure on SWR to improve rail
  • Policy I4: Open space, sport and recreation – policy to support development that improves sporting facilities, but no tangible plans for anything new
  • Policy I5: Community Facilities – a very vague policy to improve childcare facilities, healthcare, police stations, youth provision, libraries, community halls, local shops, meeting places, cultural buildings, public houses, places of worship, and public toilets. But crucially, no specific projects or proposals.

Yet, the National Planning Policy Framework (NPPF) is clear that infrastructure must be planned alongside new housing. Failure to adequately plan for infrastructure requirements and costs could lead to the Local Plan being found unsound. See references to paras 17 and 177 of the NPPF below.

plan to avoid infrastructure funding gap

NPPF Para 17: Avoid infrastructure funding gap

NPPF Para 17: Avoid infrastructure funding gap

It is clear from this post, that the proposals to build a new town will probably exacerbate the existing funding gap and not deliver any infrastructure in Fleet, Church Crookham and Hook, the very places where funding is most required.

Remedy: We therefore think the remedy to this issue should be that policy SS3 is removed in its entirety (with consequent changes to policy SS1 already outlined elsewhere). The infrastructure policies should be reworked to include as a minimum:

  • Acknowledgement of the existing £72m infrastructure funding gap
  • Quantification of the items missing from the Hampshire County Council assessment such as healthcare, extra-care housing for the elderly and green infrastructure
  • A set of prioritised, costed projects that are required to alleviate the worst of our infrastructure problems in Fleet/Church Crookham and Hook. This should include road improvements, particularly near Fleet station and the bridge over the railway near the end of Elvetham Heath Road. It should also include significant improvements to the cultural facilities, particularly in Fleet.
  • Plans to tackle Network Rail/SWR over rail capacity and services
  • Proposals for raising the necessary funds for delivering the required projects
  • Some external validation that the infrastructure plans in the draft Local Plan are ‘sound’ and will pass inspection

We believe that in preparation for the next review of the plan, a new policy should be created to regenerate our urban centres including attracting private capital so that we create a better place to live and address the existing infrastructure problems before even considering a new town that will only make matters worse.

Hart Local Plan: Missed opportunity to regenerate urban centres

Hart Local Plan Regulation 19 consultation won't regenerate Old Police Station in Fleet, Hart District, Hampshire

Hart Local Plan Regulation 19 consultation: Missed opportunity to regenerate urban centres

This is the fourth part of our submission to the Hart Local Plan Regulation 19 consultation. This article explains how we are missing the opportunity to regenerate our urban centres and why Policies Policies ED4, 5 and 6 (and SS3) need to be removed for the time being until we come up with a proper regeneration strategy. The process for making a submission is as follows:

  1. Go to the Hart Local Plan Consultation page of the Council website
  2. From the Hart website, download and complete Response Form Part A (Personal Details). A copy can be downloaded here.
  3. Also download and complete the Response Form Part B (Your Representations), a separate Part B is required for each representation you wish to make. A copy can be downloaded here.
  4. Make sure you include words of this form in each representation. Policy [X] is not sound because it is not [positively prepared, justified, effective or consistent with national policy] (delete as appropriate).
  5. Once you have filled in Part A and Part B, please email them to [email protected] or post them to Planning Policy Team, Hart District Council, Harlington Way, Fleet, Hampshire, GU51 4AE.
Submissions have to be made before 4pm on 26 March 2018. If you are keen to get your submission completed, you can use the summary guide we have pulled together, or for the more adventurous, you can use our full submission. Please edit the text into your own words.
WHH Local Plan Reg 19 Guide
WHH Local Plan Reg 19 Guide
WHH Local Plan Reg 19 Entry
WHH Local Plan Reg 19 Entry

Hart Local Plan Regulation 19 Consultation: MIssed regeneration opportunity

Fleet is the lowest density town of its size in the country. The chart below shows that there is significant scope for increasing development density in Fleet.
Hart Local Plan Regulation 19 consultation: Fleet housing density versus towns of similar size

Fleet housing density versus towns of similar size

The retail offer in Fleet is poor, the cultural facilities (e.g. Harlington Centre) are outdated and there is no proper cinema. We might as well employ botanists to identify the new species of tumbleweed appearing in the Hart Shopping Centre.

Hart Local Plan Regulation 19 consultation: Fleet Health score versus benchmarks

Fleet Health score versus benchmarks

However, Fleet has the highest average earnings per person of comparative towns by quite a large margin (e.g.: 9% more than Camberley). High earnings should give Fleet a significant advantage over the comparison towns.

Hart Local Plan Regulation 19 consultation: Fleet earnings versus competitors

Fleet earnings versus competitors

The Local Plan fails to take advantage of the opportunity to modernise Hart’s urban centres and protect Hart’s countryside.

We believe that the Local Plan should be centred on the proposition that Fleet and other urban centres will be re-generated. With Hart District Council’s full and active support, a plan based on urban regeneration would achieve the following benefits:

  1. An ambitious Hart Urban Re-generation Project (HURP) would attract private investment and thus be affordable
  2. Private investment would allow for Hart’s infrastructure to be upgraded in line with the urban re-generation
  3. Good urban design principles would achieve a higher population density in the urban centres while at the same time providing an improved ‘sense of place’ and making the urban centres more desirable places to live.

A similar approach could be adopted in Yateley to provide a proper retail-led centre and improvements could be made to Blackwater. The requirement for additional retail facilities in Hook, identified in the Reg 18 Local Plan could also be met.

Hart did have a plan to conduct a brownfield study (We Heart Hart helped to write the terms of reference) to evaluate the ‘art of the possible’ in our urban centres. This project has not delivered.

In addition, Yateley lacks a defined centre, Blackwater is indistinct and Hook lacks good quality restaurants and shopping facilities.

The council should be setting out a bold plan to improve the retail, cultural and recreational amenities in the district. We should also develop plans for a theatre and cinema in Fleet as part of an attractive mixed-use redevelopment. There will be significant cash available from developers to fund such an ambitious plan.

Instead of creating a proper masterplan,  Fleet Town Council are pursuing an ill-thought out plan for a new theatre that will leave the existing Harlington Centre to rot. This is not regeneration in any meaningful sense of the word.

Our local MP, Ranil Jaywardena, has launched a campaign to regenerate our urban centres. He said:

Looking to some of our local, district and town centres, however, it is clear to see that Fleet, Yateley and Hook are all in real need of revitalisation and regeneration. I’ve been spending time speaking to your local Councillors about this and taking a look at the work that needs to be done.

I am more convinced than ever that all three places have great potential – be that simply as shopping destinations or, with the right infrastructure improvements, as great places for our young people to get their foot on the housing ladder.

The trouble is that there is no ‘masterplan’ for any of these places. I will be raising this with Hart District Council personally – but I need your help. If you want smart new shops, some new flats for local young people to buy above them and better car parking, then act now.

The BBC has recently interviewed a number of people in Fleet about what it is like to live there. Everybody loves it, but they think there’s been too much housing and not enough infrastructure. The draft Local Plan won’t fix either of those issues, because they’re insisting on building too many houses and aren’t addressing infrastructure.

However, policies ED4, 5 and 6 effectively cast the existing centres in aspic and preclude significant redevelopment. I do not have the resources available to me to completely re-write these policies.

Remedy:  Policies ED4, 5 and 6 should be removed for the time being and a proper community team put together to work with our local councillors and MP to come up with a master plan to regenerate our town centres. Policy SS3 (together with the consequent changes to SS1 already outlined) should also be removed, so that time and energy can be freed up to address the fundamental problem of our urban centres.