Statement to Hart Cabinet

Hart District Council and Hart Cabinet Offices, We Heart Hart. We Love Hart

Statement to Hart Cabinet

The crucial Hart Cabinet meeting to decide the spatial strategy to be incorporated in the forthcoming consultation on the Hart Local Plan will be held tonight at 8pm.

Public participation is allowed and we have been allowed to speak. A copy of our prepared statement is shown below. Please do come along and watch the debate.

Statement to Hart Cabinet 9 February 2017

Thank you for allowing me to speak.

This is an important time for Hart – you are setting out a strategy that will impact the quality of life of Hart residents for many years to come, so it is important you do the best job you can.

Hart Council is in a perilous position and facing the threat of losing around £2m of NHB if the Local Plan is not in place on time and of course the threat of many speculative planning applications. So, it is right that you are risk averse at this time.

However, I would like to use this statement to persuade you to change direction.

I would like you to focus on reducing the housing target of 10,000 by removing the unnecessary uplift of 2,000 extra houses on top of the SHMA target of ~8,000.

The SHMA starts with the ONS population and household projections. It says the “the household projections… are statistically robust and are based on nationally consistent assumptions”. They take account of international migration and migration between districts.

On their own, these projections would point to a need for around 5,300 houses over the planning period. If, however, the SHMA used the more up to date 2014-based figures, the housing need would fall to around 4,500, compared to the 10,000 you are proposing to build.

That’s right, the latest demographic projections point to a need that is less than half of that you are proposing.

However, it is probably right that the housing target should be inflated a little to cater for what is termed suppressed household formation and concealed households.

The SHMA has done this by firstly increasing Hart’s target up to around 6,100 new dwellings to cater for households that are termed ‘can’t rent, can’t buy’ and those who can rent but can’t buy.

Secondly, it then makes a further increase of around 500 affordable homes. This brings the total target to around 6,600.

To my mind 6-6,500 houses would be reasonable overall that would mean we could meet the rest of the target from brownfield sites alone.

To emphasise: The SHMA has met the demographic need and already takes account of suppressed household formation, concealed households and affordable housing.

The SHMA then goes on to add a further 1,400 houses for economic growth, bringing the overall total to 8,000.

This ‘economic growth uplift’ does by definition mean that you are planning for additional inward migration to Hart, people whose needs are supposed to be met elsewhere. Not only that, the SHMA assumes many of these people will also work outside the district and thus put increasing pressure on the creaking transport infrastructure. This is not sustainable development.

Yet, you are now proposing to add a further 2,000 houses to the total to meet extra questionable affordable housing needs.

However, we have already established the SHMA itself has already taken account of the affordable requirement, so this extra 2,000 is double counting.  It will require us concreting over our green fields to meet non-existent housing needs. This is unsustainable over-development.

We wouldn’t need the new Murrell Green settlement if you removed the 2,000 unnecessary houses from the target. I might add the new settlement is entirely unsuitable. It is bordered by the M3 and A30. Criss-crossed by the railway, power lines and a high-pressure gas main. A big chunk of the site is former landfill. Only last year a solar farm was turned down on the grounds it would spoil the view from the Odiham Deer Park and spoil the enjoyment of walkers on the public footpaths. This proposal is far more intrusive than solar panels.

So finally, I urge you, please do the right thing and plan for a sensible housing target. Don’t blight our green fields with so many unnecessary houses. If you really want to help the concealed households, make sure you allocate some of the existing housing target to subsidised social-rented accommodation.

Hart Housing Target increased to 10,000

Hart Council goes through the looking glass as it ups the Hart housing target to 10,000

Through the looking glass as Hart housing target increases to over 10,000

We have gone through the looking glass as the Hart Housing target has been increased to over 10,000.

Hart has now published the document that will be discussed at Cabinet on Thursday 9 February. The main headlines are as follows:

  1. The Hart housing target has been increased to 10,077, with shall we say, questionable justification
  2. The proposed housing allocations are outlined, including a new settlement at Murrell Green

Hart housing target increased

The housing target has been increased to 10,077 as per the table below. This represents a 125% uplift on the 2014-based demographic projections.

ItemItem totalTotal
Housing demand as per 2016 SHMA8,022
Flexibility2,055
Affordable housing rental uplift520
Rural exception site delivery50
Starter homes/shared ownership285
Market housing1,200
Total "Need"10,077
Completions 2011-2016(1,830)
Commitments (to 31 Jan 2017)(3,385)
Windfalls(297)
Remaining to meet need4,565

This is a very questionable increase. The SHMA already factors in a 53% uplift on the ‘natural’ demographic projections, which would give a total requirement of 5,334 dwellings. But if they had used the more up to date 2014-based projections, the start point would fall to 4,473. If we were to use the raw 2014-based figures as our total housing target, we would have already built or permitted the total requirement.

Second, the justification to increase the total to 10,077 is to build 855 extra affordable/starter homes. But the overall increase is set at 2,055 because they don’t expect to build more than 40% affordable properties. This is simply absurd.

Figure 12.2 Stages of Objectively Assessed Need Hart Rushmoor and Surrey Heath SHMA

Third, the SHMA has already made allowance for extra affordable homes (as can be seen above), and then this has already been uplifted for extra so-called jobs growth, which themselves will deliver more affordable homes.  Hart Council seems to be adding uplift on top of uplift in a quite random and arbitrary way. We have already analysed the SHMA here and here.

Fourth, the paper itself says there is no well proven evidence-based formula to uplift the housing target. There is nothing in National Planning Policy Framework (NPPF) that requires the target to be uplifted in a mechanistic way. Nor that the requirements have to be met in full.

No need to increase the Hart Housing Target to meet afordable homes requirement

Hart Affordable housing uplift

In short, the proposed uplift is double counting uplifts that have already been made that we are under no obligation to meet anyway.

If we were to build at this inflated rate, then this would be carried forward and compounded in future demograpgic projections.

Housing Allocations

The paper sets out the proposed allocations to meet this fictitious target, including 1,800 new houses at Murrell Green.

Housing allocations to meet the Hart Housing Target

Hart District housing allocations

No mention is made of Bramshill or Grove Farm (Netherhouse Copse), which are currently under consideration by the COuncil. Indeed we understand that the developers have appealed the Grove Farm application on the grounds of non-determination. Hart were already late in considering the application in December and cancelled the January meeting. Grove Farm is not on the agenda for the February meeting. It is difficult to see how they can defend the appeal.

Conclusions

Hart District Council is in a very perilous position. If it doesn’t get a Local Plan in place soon, it will lose around £2m per year in New Homes Bonus.

So everyone has a strong incentive to get a Local Plan. But by increasing the target to over 10,000 houses, everyone loses for decades to come.

It is difficult to work out the best way forwards. We could either wait until the Regulation 18 Consultation comes out in March and hope that we can influence matters for a better outcome. Alternatively, we can fight now for radical change of both the plan and the people running the process.

Is the Murrell Green new settlement viable?

Murrell Green new settlement proposal

Murrell Green new settlement proposal

We wrote yesterday that the council has prioritised the Murrell Green new settlement as part of the Hart Local Plan. However, there are very real questions about the viability of these proposals.

  • Environmental concerns
  • Infrastructure issues
  • Coalescence of Hartley Wintney and Hook
  • Financial stability of the promoter

Environmental concerns about the Murrell Green new settlement

Part of the site includes Beggars Corner which is the triangular piece of land between the railway and motorway. A proposal for a solar farm on this land was turned down at appeal last year. The main reasons for turning it down were:

  1. Harming the enjoyment of those walking the public footpath across the site. This is shown as a dotted red line on the map
  2. Spoiling the view from the Deer Park at Odiham

Houses are obviously taller than solar panels, and indeed some houses might have solar panels on their roofs. So, how can it be sensible to build houses when solar panels were deemed inappropriate?

Furthermore, a significant part of Beggars Corner used to be landfill, with unknown contents

SHL 167 Landfill details Beggars Corner

SHL 167 Landfill details Beggars Corner, Winchfield, Hart District, Hampshire

It is not appropriate to build houses on this type of land. Nor should it be promoted as green-space for children or dog walking when we don’t know what toxins lie beneath.

It should also be noted that a 110kV electricity transmission line traverses the site as well as a high pressure gas main. Hardly appropriate for housing or recreation.

Gas Main through Murrell Green new settlement Site

Gas Main through Murrell Green Site

The site is also within the Thames Valley SPA 5km zone of influence. There are three Sites of Interest to Nature Conservation (SINC) on the site plus a further SINC just to the west at the River Whitewater.

Finally, there are a number of public footpaths that currently criss-cross the site and they appear to be destoyed by this new proposal.

Infrastructure Issues

The only access to the south of the proposed Murrell Green new settlement is Totters Lane. This is single track in places with a very narrow bridge over the railway. To the north there is the A30 which is already very busy, with choke points at Phoenix Green, Hartley Wintney and the roundabout in Hook. It is difficult to see how these choke points can be alleviated.

Those of us who use Winchfield station know that the car-park is frequently full to capacity and of course, the whole line to London is running over capacity. The idea that either Hook or Winchfield stations can accommodate the extra passengers from thousands more houses is simply laughable.

In addition, the previous strategic assessment of Murrell Green included concerns about:

  1. Healthcare provision – I can speak from personal experience that Whitewater Health that covers Hook and Hartley Wintney is full
  2. Primary school provision
  3. Availability of supermarkets

Coalescence of Hartley Wintney and Hook

The proposed site abuts the south western boundary of Hartley Wintney parish and is close to what are currently quite widely spaced houses.

Hook SHLAA sites in Hart District, Hampshire

Hook SHLAA sites in Hart District, Hampshire

The western side of the Murrell Green new settlement comes within a couple of hundred metres of the new development to the NE of Hook (sites 1, 2 and 3 on the image above). Note that sites 4 and 126 on the map above are not (yet) included in the new settlement proposal.

In essence, we are creating Hartley Winchook.

Financial viability of the promoter

Last year, it came to light that there was a ‘secret plan‘ for a very large settlement that included both Winchfield and Murrell Green. The Murrell Green part of the proposal was promoted by a company called Pearson Strategic Limited.

There are a number of pertinent facts about this company:

  1. It only has one director, James Turner
  2. It was only incorporated in November 2014 and has no revenue
  3. At the time of its last accounts, it has a negative net worth of £3,240
  4. Its only real asset is promotion rights over Totters Farm that has been mortgaged under a fixed and floating charge to Monopro Limited.

One really has to question whether we should be building the Hart Local Plan around a site with such little backing.

Accounts to Pearson Strategic can be found here.

Fixed and Floating charge document can be found here.

Conclusion

Some Hart Councillors seem hellbent on a new settlement regardless of the suitability or viability. In addition, they have not challenged the new Strategic Housing Market Assessment (SHMA) hard enough. If we are sensible about the housing targets and get properly serious about the brownfield opportunities we don’t need a new settlement anywhere in Hart.

Time to make our voice heard again.

 

Breaking News: Hart proposes new settlement at Murrell Green

Murrell Green new settlement proposal

Proposed new settlement at Murrell Green

Hart District Council has proposed a new settlement at Murrell Green as part of its spatial strategy for the Hart Local Plan. This was debated at a meeting of the Local Plan Steering Group last night. The proposal is expected to be agreed at a special Cabinet Meeting to be held on 9 February at 8pm.

The new settlement contains a site for a proposed new secondary school, outlined in yellow in the image above.

We are delighted that the new settlement at Winchfield will not form part of Hart’s strategy.

However, we are disappointed at seeing Murrell Green being put forward as a solution.

[Update] Concerns have been raised about the viability of the proposal [/Update]

Brownfield Capacity

At the council meeting last week, the Leader admitted that Hart now estimate the brownfield capacity at 2,126 dwellings. This excludes the former police college at Bramshill.

HDC Question about brownfield capacity

A realistic assessment of the capacity of Bramshill is around 250 units, bringing the total up to 2,376. However, sadly, Moulsham Lane has been given the go ahead (150 units). This would mean we would have capacity to meet even the over-stated remaining requirement of the old Strategic Housing Market Assessment (SHMA) on brownfield sites alone.

New SHMA overstates the true housing requirement

However, it now appears as though the council has caved in to demands to build even more houses that we don’t need. They have agreed to an increase in our housing allocation to 8,022. On a like for like basis, this leaves us short by 462 units.

This shortfall might well be met by the Netherhouse Copse application (436), which we now understand has been appealed by the developers on the grounds of non-determination. So even with the new SHMA, there is no need for a new settlement at Murrell Green.

At council last week, the leader refused to answer our questions about the reasonableness of building houses to increase inward migration to the district, when many of those people would work outside the district and thus put pressure on infrastructure.

HDC Question about housing numbers

The assumptions I put forward are all in the new SHMA, see here.

We need to challenge this new SHMA and resultant spatial strategy strongly. This will ensure we build the right number and right type of houses to meet local needs, rather than needlessly concrete over our precious green fields.

The full minutes of the council meeting can be found here.

 

 

 

Hart Local Plan: Green fields or fictitious jobs?

 

Should Hart concrete over its green fields for the sake of uncertain jobs forecasts

It is now becoming clear that the forthcoming Hart Local Plan will present us with a choice of concreting our green fields versus building houses for people who live elsewhere and many of them will work outside the district.

We have now had the opportunity to read the new Strategic Housing Market Assessment (SHMA) in more detail, and in particular the detail of the main driver of the housing target uplift: the jobs forecast. We have found:

  1.  The jobs forecasts uplift SHMA calculations increase the overall housing requirement for the Housing Market Area (HMA) that includes Hart, Rushmoor and Surrey Heath by 22% over and above those required by demographics and making allowance for market signals
  2. The National Planning Policy Guidance (NPPG) does not require Hart Local Plan to accommodate extra housing if jobs forecasts are in excess of forecast workforce changes in the area.
  3. The SHMA calls the jobs forecasts ‘uncertain’ and ‘divergent’
  4. If we follow the SHMA, the Hart Local Plan will plan for jobs levels closer to the the extreme high end of the jobs forecasts
  5. That all of the alleged extra jobs will have to be filled by people coming from outside the district, and many of them will work outside the district. This will have a big impact on local infrastructure, particularly roads, rail, schools and healthcare facilities.
  6. Planning for around 900 extra jobs per annum would mean we could meet our remaining housing needs from only brownfield sites
  7. The SHMA says that it would be a more sustainable policy position to plan for increased economic growth to come from productivity improvements, rather than adding lots of lower skilled jobs

This is clearly a ridiculous position, and Hart District Council should follow the advice of Peter Village QC, and consult on the level of employment we wish the Hart Local Plan to accommodate and offer us the choice of planning 900 extra jobs per annum to protect our green fields.

[update]

We would suggest the following approach to the consultation:

Option A, plan for 900 jobs per annum, and around 6,500-7,000 houses, which can be achieved on brownfield (Hartland Village, Bramshill and Sun Park) or

Option B, plan for 1,200 jobs per annum and >8,000 houses for which you will have to give up Grove Farm, and some other area like Murrell Green and/or Pale Lane or West of Hook

We think there would be overwhelming support for Option A, and we would still be planning for 250 extra jobs per annum than the demographics would suggest, so meeting the requirement for positive development.

[/update]

We set out our analysis below.

What does the NPPG say we must do?

As can be seen below, the NPPG simply asks that plan makers ‘consider’ what they should do if the jobs forecasts are in excess of the forecasts for working age population. In particular, it asks for both housing and infrastructure to be considered.

How should employment trends be taken into account NPPG Para 018 Ref 2a-018-20140306

How should employment trends be taken into account NPPG Para 018 Ref 2a-018-20140306

Indeed the SHMA itself says that the NPPG does not require plan makers to make any uplift in housing numbers at all.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA 11.50 NPPG does not require housing uplift

SHMA 11.50 NPPG does not require housing uplift

So, whilst the impact on housing and infrastructure should be considered there is no requirement to to actually increase the housing numbers.

What do the jobs forecasts say?

There is a wide range of jobs forecasts ranging from 910 pa (Experian), through 950 pa (Cambridge Econometrics) to the extreme forecast of Oxford Economics at 1,480 per annum.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA Section 5 summary range of forecasts

SHMA Section 5 summary range of forecasts

The SHMA acknowledges that the housing numbers required are extremely sensitive to the jobs growth assumptions made

SHMA 11.1 wide spectrum of forecasts

SHMA 11.1 wide spectrum of forecasts

The SHMA calls for us to plan for 1,200 extra jobs per annum which is closer to the extreme high end of the Oxford economics forecast.

What does the SHMA say about the Employment Forecasts?

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA 11.74 and 11.75 Genuine uncertainty no need to plan for extremes

SHMA 11.74 and 11.75 Genuine uncertainty no need to plan for extremes

The SHMA says that there is genuine uncertainty about the scale of jobs growth that might be expected and the forecasts are widely spread and divergent.

Where would the people come from and where would they work?

We are told that the extra people to fill these jobs would come from other areas:

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment SHMA 11.56 Population growth from inward migration from other areas

SHMA 11.56 Population growth from inward migration from other areas

If other local authorities are following NPPG, they should already be planning housing for these people. Indeed we have found that many planning authorities are planning for an average of 42% more housing than demographic trends would suggest they need.

But it gets worse, in that the SHMA would lead to many of these inward migrants working outside the district, putting unsustainable strains on the transport network. We already know the rail network is forecast to be running well over planned capacity with no real plan to fix it.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA 11.51 Excess housing supply could lead to extra out commuting

SHMA 11.51 Excess housing supply could lead to extra out commuting

Currently, more than half of Hart’s working population work outside the district and 40% of the HMA’s working population work outside the HMA.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA Figure 11.1 and S11.15 out commuting calculation errors

SHMA Figure 11.1 and S11.15 out commuting calculation errors

What would the Hart Local plan be if we planned for fewer jobs

If we planned for closer to 900 extra jobs per annum, we would need 950 houses per annum in the HMA. Hart would need 305 per annum, leading to an overall housing requirement of 6,405 which would mean we wouldn’t need any more green field sites.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA Figures 11.13 and 11.14 housing projections for range of job growth

SHMA Figures 11.13 and 11.14 housing projections for range of job growth

Taking account of market signals, the housing requirement for the HMA would be around 1,050 per annum. This would lead to Hart’s overall need being around 7,000. Again, we wouldn’t need any more green field sites to meet this requirement.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA Figure 11.17 Housing projections taking into account market signals and jobs forecasts

SHMA Figure 11.17 Housing projections taking into account market signals and jobs forecasts

What does the SHMA say about economic growth?

The SHMA says it would be more desirable to achieve economic growth through productivity enhancements and it would be a more sustainable solution.

Hart Surrey Heath and Rushmoor (HRSH) Strategic Housing Market Assessment. SHMA 11.55 Better to achieve economic growth through productivity improvement

SHMA 11.55 Better to achieve economic growth through productivity improvement

So, why don’t we go for a more sustainable solution and plan for 900 extra jobs per annum?

Hart Local Plan still in disarray

 

Hart Local Plan still in disarray

The minutes of the Cabinet meeting held on 5 January sadly show the Hart Local Plan is still in disarray.

Lack of clarity on extra 2,000 houses

The ‘topic paper’ about the extra 2,000+ houses sprung on members late last year has not yet been produced. It appears that the requirement for the extra houses was decided by an officer on his own initiative. However, it should more properly be a policy decision for members.

Uncertainty on testing of Winchfield New Town

There is still uncertainty about the level of testing that has been carried out in relation to the potential Winchfield New Town. This was the only option recommended for testing at the fateful council meeting in November 2014. The Local Plan Steering Group (LPSG) on 13 December 2016 agreed:

Further testing of a new settlement option would take place and be brought back for consideration

When challenged about this at Cabinet, the leader said:

Testing is a continual process as further information becomes available to us. The officers had tested a new settlement option, however officers had been asked to benchmark against work already completed for this site.

This sounds like bureaucratic gobbledygook and gives no clarity at all. Back in October, the unoffical news was that Winchfield New Town had failed testing. One wonders what exactly has been going on for the past two years.

Litany of Hart Local Plan delays

Apparently, the already delayed Local Plan, will be delayed by a further 4-6 weeks whilst this new ‘testing’ is carried out. Presumably, the consultation will not now happen until March or April this year.

This is the latest in a long line of delays:

In October, 2013, when the earlier version of the Hart Local Plan was rejected by the planning inspector, the council said:

“Cllr Parker said that while the council operates under the interim strategy, it is working on an updated Local Plan.

“We expect to put this out for consultation early next year, and would look to submit it to an inspector next autumn[2014],” he added.”

In April 2014, the plan was to have a resubmission plan ready for consultation in October 2015.

By February 2015, the plan was to have a resubmission plan ready for Autumn 2015.

The plan was delayed yet again in April 2016, with the timetable clearly stating that a draft version of the Local Plan would be published in September 2016.

When we reached August 2016, the timetable slipped again, pending the arrival of the new SHMA.

Finally, in November 2016, the consultation version of the Hart Local Plan was due to be published on 3 February 2017.

Our best estimate of of the timetable, with the plan and slippage since April 2016 in brackets is as follows:

Consultation Draft Hart Local Plan – March/April 2017 (Summer 2016, 8 months slippage)

Submission Plan – July 2017 (Autumn 2016, at least 8 months slippage)

Submit to Secretary of State – TBA (Winter 2016, unknown slippage)

Examination – TBA (Spring 2017, unknown slippage)

Adoption – TBA (Summer 2017, unknown slippage)

Education funding climb down

In other news, Hart District Council was forced into a humiliating climb down on its stance on S106 contributions for education. All funds raised from developers must now be remitted to Hampshire County Council (HCC). HCC will now be a party to all agreements about education funding.

 

The minutes of the Cabinet Meeting held on 5 January 2017 can be found here.

The minutes of the LPSG held on 13 December 2016 can be found here.

The paper about S106 education provisions can be found here.

 

Hart misses out on brownfield starter homes scheme

Berkeley Homes (St Edward) launches consultation site for new development at Hartland Village, aka Pyestock and Hartland Park

The Government has given the green light for thousands of starter homes to be built on brownfield sites across the country. Rushmoor is one of the 30 Starter Home Land Fund partnerships, but unfortunately, Hart District is not on the list.

The partnerships have been established under the government’s £1.2 billion Starter Homes Land Fund. This scheme supports the development of starter homes on sites across England. They will be built exclusively for first-time buyers between 23 and 40 years old at a discount of at least 20% below market value.

It is a real shame that Hart has not seized the initiative to be part of this scheme, when only last year it was saying:

Hart District Council is proud to be one of a number of local planning authorities who have agreed to first pilot the creation of a Brownfield Land register

Hart has also not yet published the results of their brownfield study. This was supposed to outline the art of the possible with a number of urban brownfield sites in Fleet.

It is also disappointing because Hart is not building enough smaller properties whilst over-building 4+bed houses. A real commitment to starter homes on brownfield sites would go a long way towards meeting the housing needs of the district.

However, all is not lost as the Homes and Communities Agency is seeking expressions of interest from local authorities who are interested in using their land to deliver homes at pace through the recently announced £1.7 billion accelerated construction scheme. This will see up to 15,000 homes started on surplus public sector land this Parliament.

Open letter to Ranil Jayawardena, Sajid Javid and Gavin Barwell

Ranil Jayawardena Stephen Parker and Michael Fallon meet at Pyestock (Hartland Park or Hartland Village

Below is the text of an open letter sent to our Local MP, Ranil Jayawardena asking for his help to make changes to national policy to help Hart come up with a more realistic Local Plan and help fend off the threat of too many houses.

Let’s see what happens.

Dear Ranil,

To date, I have been very impressed with you as our local MP. You seem to be well in tune with your constituents and your campaign to promote more brownfield development in our area is to be commended.

I know that, quite rightly, you are reluctant to get involved in local planning matters because they are the responsibility of the local council. However, I am writing to you today to ask for your support in changing some elements of national policy that should help Hart District Council produce a more realistic Local Plan.

There are four main sections to this letter:

  • Process and outcome of assessing housing need
  • Affordable housing
  • Infrastructure contributions
  • Suggested policy changes

The links in the text take you to more in depth research, mostly from the WeHeartHart.co.uk website, which I run, to support the assertions made. I have also copied this letter to the ministers responsible for this area of policy and the leader and joint-CEO of Hart Council.

Assessing Housing Need

 

The 2012-based government projections of population and number of households points to a need of around 215,000 dwellings per annum, compared to recent delivery of 130-150,000 new dwellings each year. It is clear we need to respond to the objective in the National Planning Policy framework to “boost significantly the supply of housing”. To achieve this, it follows that the sum of all the housing market assessments across the country should add up to the total expected increase in households, or a little more to give some margin of safety.

However, there is increasing evidence that house builders have too strong an influence over the process that is leading to housing market assessments being artificially inflated to a level much higher than that required by the national household projections.

In Hart, the 2014 Strategic Housing Market Assessment (SHMA) is currently being revised to take account of more up to date population and household forecasts. However, I believe the process being followed will be largely the same as before.

The way it works is as follows. The raw household forecasts are subject to a set of dubious adjustments and convoluted calculations to arrive at a spurious objectively assessed ‘need’.  In the case of the 2014 SHMA, the outcome was ~7,500 houses. For the SHMA area as a whole this results in an uplift to the raw DCLG household forecasts of more than 50%.

If this were applied across the whole country, then we would be allocating land and allowing the building of some 305,000 new dwellings each year, far above the national requirement. This goes against latest planning guidance that states that housing need should be “principally understood as a measure of future demand rather than aspiration”.  I did make a FOI request to the DCLG to provide the national figures, but this has been refused on the grounds that DCLG “does not hold this information”. Given the importance that is being placed on housing delivery, it is quite staggering that central Government is not collecting the data to allow it to monitor the results of its own housing policy.

The experience of the Hart, Surrey Heath and Rushmoor SHMA is by no means unique. Analysis of five other housing needs assessments of planning authorities across Hampshire, Oxfordshire, Surrey and Berkshire reveals an average housing uplift on the baseline household projections of around 42%.

A further illustration of the absurdity of the calculations used in the 2014 SHMA is contained in its own appendix.  This clearly shows that if the more up to date 2012-SNPP number were used, the starting point for Hart would fall from 337 to 247 dwellings per annum or a fall of 1,800 units over the plan period.

Taken together, these results show that the process for producing the SHMAs is fatally flawed and cannot be justified.

There might be some justification if this process had actually resulted in more house building. But it is clear from a recent House of Lords report that it has not:

Nevertheless, we see the gap between planning permissions and housing completions as a fundamental one in respect of securing increased housing supply. In a climate where over 240,000 homes a year are being granted planning permission, it is a fundamental failure of the development system that over 100,000 fewer homes are actually being built. This situation must be addressed.

We believe that the Government must consider measures to help accelerate the delivery of housing on sites with planning permission, such as permitting the charge of equivalent council tax rates when development has not commenced after a specified period of time, subject to safeguards when there are genuine reasons to prevent the development proceeding

This is borne out by local experience, where as of 1 April this year there were over 3,000 unimplemented planning permissions, with over 1,000 of those from 2013 or earlier.

It is clear that creating ever increasing housing targets is merely encouraging ‘land-banking’ by builders, who then build at a rate to maximise their own profits.

Imagine my surprise to find out that one of the outcomes from Hart’s yet to be published revised SHMA is that the housing target is going to be raised again to over 10,000 units (although this is being further examined by the council). Yes, you read that correctly: despite the starting point being based on the more up to date population forecasts described above, that should result in a ‘need’ of 1,800 fewer houses, the target is going to be raised 30% above the earlier ‘need’ and nearly 100% above the new starting point.

Apparently, there are some further arbitrary adjustments, some other sophistry and some new guidance from Government about the provision of so called ‘Affordable Homes’ that means in order to satisfy a shortfall of ~800 affordable homes, we must build over 2,000 more new houses in total because the affordable component cannot be more than 40% of the total.

The consequence of this change is that it will inevitably mean we can no longer meet our remaining housing need from brownfield sites and will have to sacrifice great swathes of our beautiful countryside to satisfy some bureaucratic pen-pushers rather than the actual housing needs of the district.

This is plainly ridiculous and cannot be allowed to stand. But that leads me on to policy improvements  around ‘Affordable Homes’

 

Affordable Homes

 

Many in Government seem to hold the view that merely calling some houses ‘”Affordable” makes them so. This is clearly an absurd position to take.

Let’s take a local example in my own village.  Recently, Bewley Homes built around 90 new houses in a new development called Hartley Row Park at a reasonably sensible add-on to the village.

The lowest price for a 3-bed semi-detached home was set at £465,000. The lowest anticipated price of the 2-bed homes that were due to be released later in 2016 was £370,000. This means that the cheapest 3-bed house is 11.5 times median income, and the cheapest 2-bed home will be 9.2 times median income.  Even with a 20% ‘Affordable’ homes discount, the cheapest new properties will be totally out of reach of middle-income families in the district.

This is further compounded by the lack of measurement and poor controls over the size of properties bring built. There is clear evidence that Hart is under-building 1-bed and 3-bed starter homes and over-building 4+bed properties. This is doing nothing for the younger residents of Hart, whom the Local Plan is supposed to serve, yet encouraging even more inward migration from London into properties that locals cannot afford. Clearly, the controls needed are really a matter for the local council, but there may be something that can be done at a national level to mandate new developments to meet local needs.

However, there are some national policies that need to be examined, not least the ‘Help to Buy’ scheme, interest rates and QE.

As any economist will tell you, if you subsidise the price of anything, then demand will go up and prices will follow. I find it quite amazing that a supposedly free-market Conservative Government is borrowing to use taxpayers’ money in the HTB scheme to subsidise higher house prices, especially at a time when we still have a massive budget deficit.

But the bigger impact on house prices has probably come from ultra-low interest rates and QE. This inexorable flow of cheap money has artificially raised the price of all assets and property in particular. You cannot hope to bring house-prices to reasonable levels unless and until you address monetary policy.

 

Infrastructure Contributions

 

Hart, like many other places in the country is suffering from creaking infrastructure. Our schools are full, it is difficult to get appointments at the doctors and road congestion is increasing.

According to the latest figures available Hart is running a £78m infrastructure funding deficit, and this is probably an under-estimate as it was prepared before the current, let alone the new SHMA. Key quotes from the document include:

“It is therefore reasonable to conclude that it is unlikely that there will be sufficient future funds, from both capital programmes and developer contributions, within the plan period, to deliver all of the projects listed in the HCC Transport Statement”

“Although developer contributions will continue to play an important role in helping to bridge the funding gap, it is also clear that the funds raised through developer contributions will only contribute a modest proportion of the total identified funding gap”

 “The South West Main Line (SWML) outer trains, which serve Hart, has significant forecasted future peak crowding, with a capacity shortfall of over 6,100 passengers in the high-peak hour, even if every main line train is at maximum length”

It is true that many developments attract S106 or CIL contributions towards infrastructure. However, it is also clear that both ‘Affordable Homes’ and office conversions using ‘Permitted Development Rights’ deliver no such contributions. Overall, the policy mix has delivered a massive funding gap, yet we are expected to continue to even more houses, when the funding delivered is much less than the funding required to bring the infrastructure up to scratch.

This is clearly unsustainable and must change.

 

Suggested Policy Changes

 

As I see it you can help your constituents by demanding policy changes in several key areas:

  • The Government should collect and analyse all SHMAs across the country to monitor that the total of the local ‘needs’ is in line with the overall national totals
  • There should be some greater controls put on the way that seemingly arbitrary adjustments to the starting points are made to ensure they do not go too far above those levels. 20% would seem like a reasonable level to me.
  • Encourage builders to build existing planning permissions faster by introducing a charge equivalent to council tax rates when development has not completed after a specified period of time.
  • Stop subsidising higher house prices through HTB, QE and ultra-low interest rates.
  • Introduce a ‘planning gain levy’ on land owners who make significant windfalls from selling agricultural land for development to fund infrastructure. This would be similar to the original ideas behind “Garden Cities” where landowners helped fund infrastructure
  • Introduce S106/CIL funding for all new development. Every new home has people in it and they all use local infrastructure, so all new development should include some contribution
  • Introduce ‘open book accounting’ to each development and force developers to make increased S106 contributions if they make more than planned profit on a development.
  • Increase Government funding for smaller, local infrastructure projects such as road widening, junction improvement, bridge widening, school building and surgery building. This would be a much better use of money than building white elephants like HS2.

I do hope you find this letter constructive and helpful in understanding the impact of national policy on your local area.

May I wish you and your family a Merry Christmas and a happy and prosperous New Year.

 

Yours sincerely,

 

Time to work together to head off new Hart housing threat

Hart Housing threat: sites under consideration

Hart Housing threat: sites under consideration

Overshadowed by our earlier  story of CCH further delaying the Hart Local Plan was the news of the new Hart housing threat of our target being raised from 7,500 to over 10,000 new houses up to 2032. This comes on top of the potential financial costs of delay.

Details of how this has come about are sketchy. It is related to how Hart should respond to Government rules about how to deal with affordable housing. We understand Hart Council is working on a ‘topic paper’ to give a further explanation.

We have analysed the impact of this new target below. Sadly, most of the large, sensitive green field sites are potentially under threat once again.  In addition, it is likely that Hart would no longer have more than five years of land supply. This exposes us to the threat of speculative planning applications. If most of these additional houses end up being ‘affordable’, they won’t attract contributions from developers to fund vital infrastructure.

So, we have come to the conclusion that it is time for all the politicians and pressure groups to work together to fight off this new threat rather than spend their time arguing over where the new houses should go. This level of development will mean that substantially all of the district will be under threat for some time. Moreover, this increased rate of building will be carried forward into the new planning period making things even worse for decades to come. We need to demand three key actions:

  1. The councillors need to stop squabbling and get a Local Plan in place ASAP
  2. Challenge robustly this new housing target and get the ridiculous new Government rules changed
  3. Pressure the council to properly examine the brownfield options for the district, complete their brownfield study and bring these sites forward instead of the precious green field sites.

Impact of the Hart housing threat on sensitive sites

First we take a look at where we would need to build to meet this new target and compare it to last year’s consultation; the most recent land supply position and our estimate of a ‘fair’ housing target.

Impact of new Hart housing threat on Hart District sites

Impact of new Hart housing threat on sensitive sites

As can be seen above, if the housing target remains around current levels, our remaining housing needs can easily be met from brownfield sites such as Hartland Village (Pyestock), the sites Hart Council identified in the consultation, Bramshill House and some further redevelopment of Ancells Farm and Bartley Wood. Moulsham Lane, Yateley was given the go ahead at appeal over the summer.

For some reason related to the Hop Garden Road appeal, Hart decided to increase our housing requirement up to 8,022 houses.  This is achievable from the 4,000 units we have identified on brownfield sites. But the planners would need to be persuaded to:

  • Redevelop the area around the Harlington and Hart’s offices in Fleet for mixed use.
  • Bring the many other smaller borwnfield sites across the district into the equation.

Failing that, it is inevitable that one of the green field sites is chosen.  For the purposes of this analysis we have used Grove Farm/ Netherhouse Copse as that is up for determination at the moment and the officers have recommended it.

Our estimate of a ‘fair’ housing target is based on the work of Alan Wenban-Smith. This starts with the population projections which on their own would generate a housing need of 5,040 houses over the planning period. A generous allowance is then added for additional economic growth to arrive at a need of 7,140 houses. This is easily achievable on brownfield sites, with some left over for future periods. Note that the new housing target is twice the level of housing required to meet the projected population forecasts.

The new target of 10,177 houses makes it much more difficult to achieve on brownfield. Again, the brownfield capacity could be larger than indicated above if the councillors and planners were to finally deliver on their brownfield study. If they don’t, it is inevitable that most of the sensitive green field sites including Pale Lane (Elvetham Chase), the land west of Hook and one or more of Murrell Green, Winchfield, Lodge Farm or Rye Common come into the equation. As you can see this new housing target will impact everyone.

Impact of Hart housing threat on the land supply

In the absence of the Hart Local Plan and up to date policies, the only defence we have against voracious developers is the five year land supply. This gives some limited control over speculative planning applications. So, we have taken a look at what the new target will mean for our five year land supply.

Impact of new Hart housing threat on 5 year land supply

Impact of new housing target on Hart District 5 year land supply

The left hand columns show the current 5-year land supply that Hart Council use. This shows we are in the relatively comfortable position with over 6 years land supply. If We Heart Hart’s fair housing target was adopted this would rise to 8 years supply.

However, the new housing target would reduce our land supply to below the crucial 5-year threshold leaving Hart very exposed. We would need another 525 additional houses to be granted permission ASAP to bring us back over the threshold.

Conclusion

We are in a very serious position with many of our cherished green fields under grave threat from speculative planning applications. There is no Local Plan and our policies are out of date. Hart is running an infrastructure funding deficit of £78m. The new housing target is double what we need to meet the official Government population forecasts. If the new housing target is adopted, Hart will no longer have a five year land supply. Unless we change tack, all our green fields will be concreted over and lost forever.

To preserve all that makes Hart such a great place to live we need to take serious action:

  1. The councillors need to stop squabbling and get a Local Plan in place ASAP
  2. We need to challenge robustly this new housing target and get the ridiculous new Government rules changed
  3. We need to pressure the council to properly examine the brownfield options for the district, complete their brownfield study and bring these sites forward instead of the precious green field sites.

This can only be done by everyone with a stake in Hart housing development working together to get the best outcome for Hart.

CCH force delay to the Hart Local Plan as housing numbers rise

CCH force delay to Hart Local Plan- this is no time to keep calm

This is no time to keep calm

We Heart Hart has learned that last night’s meeting of the Hart Local Plan Steering Group was a”disaster”.  Concrete Community Campaign Hart (CCH) councillors forced a further delay on to the timetable by insisting that Winchfield New Town is included as an option.

Affordable Housing blow

In a further blow, it appears as though Hart’s housing allocation has been further inflated by up to 2,000 additional houses due to new Government guidelines that may force Hart to build even more ‘Affordable Homes’. This new requirement would be in addition to the 40% of homes that must be ‘Affordable’ in the SHMA target.

Apparently, there are no plans to publish the new Strategic Housing Market Assessment (SHMA) until they are ready to publish the Regulation 18 consultation on the new draft Local Plan. We don’t know the timescale for that yet.

This shows that Hart’s statement in October that Hart had to build 1,500 fewer houses was a total sham.

Impact of Delay to the Hart Local Plan

There were three potential options on the table at LPSG for detailed consideration. However, CCH insisted on a fourth option that included the Winchfield New Town. We don’t know the specifics of the other options, but we suspect they included Grove Farm/Netherhouse Copse.

WeHeartHart had been led to believe that the Winchfield New Town option failed testing due to concerns about groundwater flooding and lack of infrastructure. The level of testing that was carried out is now in doubt. It is difficult to see how a further delay and more testing is going to change the viability of the new town.

CCH’s stance is strange because the delay to the Local Plan will weaken Hart’s defences against the speculative applications being submitted by developers. The proposed developments at Grove Farm/Netherhouse Copse and Bramshill House are due to be determined at tonight’s Planning Committee meeting. Of course, an application to develop the Pale Lane site into Elvetham Chase has recently been submitted and this will need to be determined in the New Year. If there is no draft Local Plan, then it will be difficult to defend against it.

Conclusion

It is imperative that we get the Hart Local Plan in place quickly so we can manage the inevitable housing growth that we face. CCH should stop their ideological pursuit of the unviable Winchfield New Town and start to work constructively to solve the problems of the whole district.

We would wish to see many new homes that are truly affordable for Hart residents. However, there is strong evidence of developer land-banking in Hart and of not building enough smaller properties. Simply increasing the housing target won’t lead to a meaningful increase in housing supply. Even the smallest properties at recent developments (for instance Rifle Range Farm/Hartley Row Park at Hartley Wintney) were out of reach of most Hart residents. We think the new additional target for affordable homes should be vigorously challenged.